BLD-Final | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | PASS |
Tom Arcoraci
|
|
|
The hand rail height problem has been corrected Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Final | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | FAIL |
Mike Jordan
|
|
|
bld15 final Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Provide code compliant handrail. Everything else ok.
|
FIRE-Final Inspection | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Troy Cobbley
|
|
|
Life Safety Passed
|
BLD-Wall cover | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd. floor north and south units, firestopping, and shearwalls ok. central units, 2nd. floor only.
|
BLD-Wall cover | 11/15/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Mike Jordan
|
|
|
first floor Phone #: ###-#### >> Inspection requested via web by Mike McHargue. All remaining units ok to cover.
|
BLD-Wall cover | 11/13/2013 | 11/14/2013 | 11/14/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Work in progress on remaining units, 1st and 2nd layers on 1st floor central units and south units ok.
|
BLD-Wall cover | 11/11/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Mike Jordan
|
|
|
fire caulking / framing Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 2nd. floor center units and south units ok to cover. ok for 2nd layer on ceiling at first floor center and south units.
|
BLD-Wall cover | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor north end units ok for tape. 3rd floor central units ok for tape.
|
BLD-Wall cover | 11/7/2013 | 11/7/2013 | 11/7/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. work in progress.
|
BLD-Wall cover | 11/6/2013 | 11/6/2013 | 11/6/2013 | P | PART |
Mike Jordan
|
|
|
Drywall screws Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Work in progress on on interior shearwalls and party walls. No new units ready.
|
BLD-Wall cover | 11/5/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. North units, 2nd. floor 1st. layer ok.
|
BLD-Wall cover | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | PART |
Mike Jordan
|
|
|
Screw inspection Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 3rd floor, North and south end units, interior shear walls, party walls and corridor walls ok. All firestopping completed. Ok to tape and cover.
|
BLD-Energy code compliance | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Mike Jordan
|
|
|
Insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 10/28/2013 | 10/29/2013 | 10/29/2013 | A | NR |
Mike Jordan
|
|
|
Insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | NR |
Mike Jordan
|
|
|
Insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Mike Jordan
|
|
|
Air Seal Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Airseal has been completed.
|
BLD-Framing/Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargueok to insulate 1st. 2nd. and 3rd. floors. All firestopping completred. fireblock at 3rdfloor ceiling behind tubs. Provide additional 5/8 type x sheet rock at chases, 2nd. floor vent fans. Add straps at double top plate splices in same spot.
|
FIRE-Sprinkler Rough-in | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | PASS |
Troy Cobbley
|
|
|
Tenting in attic space is approved. Piping can be covered.
|
BLD-Conference | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD-Wall cover | 10/18/2013 | 10/21/2013 | 10/21/2013 | P | CANC |
Mike Jordan
|
|
|
Fire Caulking Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Inspection done in the am.
|
BLD-Framing/Rough-in | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Walk through on 1st. floor only. Work in progress on firestopping. All trades not yet inspected. No cover at this time.
|
BLD-Wall Bracing | 9/10/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Mike Jordan
|
|
|
Sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st, 2nd and 3rd floor exterior shearwalls ok. ok to cover exterior of building.
|
BLD-Wall Bracing | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | FAIL |
Mike Jordan
|
|
|
Exterior Sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargu. All floor to floor straps on exterior sheathing installed. Noted several areas were nailing was missing or needs to be tightened up.
|
BLD-Wall Bracing | 8/26/2013 | 8/26/2013 | 8/26/2013 | A | FAIL |
Mike Jordan
|
|
|
First two floors of building 15 sheer / straps / hold downs. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Several areas missing nailing and holdowns need to be tightened down.
|