Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-01398
StatusFinaled
Name BARROW DESIGN & CONSTRUCTION
Site Address 1012 E BRAEMERE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
PLAN MODIFICATION TO ADD A 714 SQ. FT. BASEMENT. cdm WUI ZONE A, Permit for the construction of a new 3,236 sq. ft., two story (lower level 1,013 sq. ft., main level 2,223 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, 805 sq ft deck/patio and a 960 sq. ft. attached garage per the approved plans, prescriptive energy, structural engineering, Statement of special inspection, plan review report and any notations. R-1B zoning and setbacks per planning. AJS All compaction testing/ fill results and a letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/17/201511/18/201511/18/2015APASS
DetailsTony Young
Bob Phone #: ###-####
DOC - Permit Finaled11/18/201511/18/201511/18/2015PPASS
DetailsTony Young
c of o issued
BLD-Final10/6/201510/7/201510/7/2015ANR
DetailsTony Young
Bob Phone #: ###-####,, need firecaulking,, need guardrail on drive way
BLD-Final3/30/20153/30/20153/30/2015PNR
DetailsTony Young
David Phone #: ###-####
BLD-Energy code compliance7/7/20147/7/20147/7/2014PPASS
DetailsJim Storey
David Phone #: ###-####
BLD-Framing/Rough-in6/23/20146/24/20146/24/2014PPASS
DetailsTom Arcoraci
David Phone #: ###-#### - call 15 mins prior
BLD-Wall Bracing6/13/20146/16/20146/16/2014APART
DetailsTony Young
David Phone #: ###-####,, exterior shear ok,, will need interior
BLD-Footing1/28/20141/28/20141/28/2014PPART
DetailsTony Young
Steve Phone #: ###-####,, stair ftg,, patio area,, front left,, (south,,east)
BLD-Foundation11/27/201311/27/201311/27/2013PPEND
DetailsTony Young
Steve Phone #: ###-####,, engineer looked at everything because they wanted to pour this am,, pending letter of ok
BLD-Footing10/8/201310/9/201310/9/2013APART
DetailsTony Young
steve Phone #: ###-####,, footing rebar all in place
BLD-Footing10/7/201310/8/201310/8/2013APART
DetailsTony Young
steve Phone #: ###-####,, work in progress..