FIRE-Final Inspection | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety passed pending one additional fire extinguisher is posted within allowable travel distance at the 1st floor remodel area and one missing EM light is installed per plan at the exit hall 1st floor east side.
|
BLD-Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Dave Hannah
|
|
|
rick PLEASE call before going out Phone #: ###-####
|
DOC - Permit Finaled | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/25/2013 | 9/26/2013 | 9/27/2013 | P | PASS |
Dave Hannah
|
|
|
Richard-PLease call when on your way to inspection Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/13/2013 | 9/16/2013 | 9/17/2013 | A | PASS |
Dave Hannah
|
|
|
After 9AM - Rick Phone #: ###-#### repaired fire proofing on roof
|
BLD-Framing/Rough-in | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Dave Hannah
|
|
|
richard Phone #: ###-####
|