BLD-Final | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PART |
Mike Jordan
|
|
|
walk through on work in progress on phase 1, part A and B.
|
BLD-Other | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Mike Jordan
|
|
|
rebar insp //Charles Phone #: ###-####. Interior slab on grade, 4 inch and 6 inch slabs for phase 1 part B at gridlines 11-13/AA-J 8-13/AA-C.
|
BLD-Footing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Mike Jordan
|
|
|
CHARLES - REBAR Phone #: ###-####. Rebar for light weight concrete placement on roof deck of patient addition phase 1A.
|
BLD-Framing/Rough-in | 11/19/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Mike Jordan
|
|
|
CHARLES - Phone #: ###-####. INterior steel steud partition wall for xray room C135, phase 1B. Structural steel beam to column connections, roof decking as per approved plans. All special inspections for complete joint penetration welds, fillet welds puddle welds and nelson studs ok, for patient phase 1A patient addition.
|
BLD-Footing | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | CANC |
Mike Jordan
|
|
|
Charles Miller-Re-bar inspection please Phone #: ###-####
|
BLD-Foundation | 10/31/2013 | 10/31/2013 | 10/31/2013 | A | PART |
Mike Jordan
|
|
|
Charles Miller-Re-bar inspection please Phone #: ###-####. work in progress on stemwalls, area b. Will be ok for concrete after approval from special inspector.
|
BLD-Footing | 10/16/2013 | 10/17/2013 | 10/17/2013 | P | CANC |
Mike Jordan
|
|
|
requesting around 2:30 for rebar - Charles Phone #: ###-####
|
BLD-Foundation | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Mike Jordan
|
|
|
requesting around 2:30 for rebar - Charles Phone #: ###-####. Permiter stemwalls, north addition ok.
|
BLD-Footing | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PART |
Mike Jordan
|
|
|
Charles Miller Phone #: ###-####. Footings on north side of building for moment frames. Strata to verify the install of plate washers on threaded anchor bolts.
|
FIRE-Conference | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | DONE |
Troy Cobbley
|
|
|
charles miller and I went over the exiting requirements which appear to have been approved through plan review. We also discussed inspections needed for the re-routed fire line. I deferred him to the fire dept for requirements to temporarily shut down on site fire hydrants.
|
BLD-Other | 10/31/2013 | 11/1/2013 | | P | |
Mike Jordan
|
|
|
rebar on a slab // charles Phone #: ###-####
|