Permit Information
Permit NumberBLD13-01539
StatusFinaled
Name THE ROBINS & MORTON GROUP
Site Address 8800 W EMERALD ST
Project NameTreasure Valley Hospital
Customer Number 
ePlanReviewYes
Description
(TREASURE VALLEY HOSPITAL - Phase I) This permit is to permit the grading and drainage, foundation, and superstructure only. Phase II and III will be permitted under separate permits and include all tenant improvement work and all modifications to the existing structure under those phases and permits. Scope of work includes: construction of foundation, construction of steel superstructure, minor work to maintain compliant egress of occupied hospital, new plumbing, new electrical, and site work. TLW
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
Charles Phone #: ###-####
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
FIRE-Final Inspection12/4/201412/4/201412/4/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference1/22/20141/22/20141/22/2014PPART
DetailsMike Jordan
walk through on work in progress on phase 1, part A and B.
BLD-Other1/2/20141/2/20141/2/2014PPASS
DetailsMike Jordan
rebar insp //Charles Phone #: ###-####. Interior slab on grade, 4 inch and 6 inch slabs for phase 1 part B at gridlines 11-13/AA-J 8-13/AA-C.
BLD-Footing11/18/201311/19/201311/19/2013APASS
DetailsMike Jordan
CHARLES - REBAR Phone #: ###-####. Rebar for light weight concrete placement on roof deck of patient addition phase 1A.
BLD-Framing/Rough-in11/19/201311/19/201311/19/2013APASS
DetailsMike Jordan
CHARLES - Phone #: ###-####. INterior steel steud partition wall for xray room C135, phase 1B. Structural steel beam to column connections, roof decking as per approved plans. All special inspections for complete joint penetration welds, fillet welds puddle welds and nelson studs ok, for patient phase 1A patient addition.
BLD-Footing10/30/201310/31/201310/31/2013ACANC
DetailsMike Jordan
Charles Miller-Re-bar inspection please Phone #: ###-####
BLD-Foundation10/31/201310/31/201310/31/2013APART
DetailsMike Jordan
Charles Miller-Re-bar inspection please Phone #: ###-####. work in progress on stemwalls, area b. Will be ok for concrete after approval from special inspector.
BLD-Footing10/16/201310/17/201310/17/2013PCANC
DetailsMike Jordan
requesting around 2:30 for rebar - Charles Phone #: ###-####
BLD-Foundation10/17/201310/17/201310/17/2013PPASS
DetailsMike Jordan
requesting around 2:30 for rebar - Charles Phone #: ###-####. Permiter stemwalls, north addition ok.
BLD-Footing10/14/201310/15/201310/15/2013APART
DetailsMike Jordan
Charles Miller Phone #: ###-####. Footings on north side of building for moment frames. Strata to verify the install of plate washers on threaded anchor bolts.
FIRE-Conference9/16/20139/17/20139/17/2013ADONE
DetailsTroy Cobbley
charles miller and I went over the exiting requirements which appear to have been approved through plan review. We also discussed inspections needed for the re-routed fire line. I deferred him to the fire dept for requirements to temporarily shut down on site fire hydrants.
BLD-Other10/31/201311/1/2013 P 
DetailsMike Jordan
rebar on a slab // charles Phone #: ###-####