BLD-Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Dave Hannah
|
|
|
clint Phone #: ###-#### blower door 3.8
|
DOC - Permit Finaled | 2/12/2014 | 2/12/2014 | 2/12/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
BLD-Energy code compliance | 12/3/2013 | 12/10/2013 | 12/10/2013 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 12/3/2013 | 12/6/2013 | 12/6/2013 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Jim Storey
|
|
|
Joey Phone #: ###-####
|
BLD-Wall Bracing | 11/14/2013 | 11/14/2013 | 11/15/2013 | P | PART |
Dave Hannah
|
|
|
Joey Phone #: ###-#### second floor ok to cover ext.
|
BLD-Foundation | 10/10/2013 | 10/11/2013 | 10/14/2013 | P | PASS |
Dave Hannah
|
|
|
wes Phone #: ###-####
|
BLD-Footing | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
wes - call prior to going Phone #: ###-####
|
BLD-Footing | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
wes Phone #: ###-#### (this inspection was scheduled for yesterday afternoon, but this inspection was not reassigned to an available inspector so Bob A. auth to pour and will verify footing this morning)
|
BLD-Footing | 10/3/2013 | 10/3/2013 | 10/4/2013 | P | PASS |
Dave Hannah
|
|
|
anton Phone #: ###-#### setbacks ok ? about grade
|