Permit Information
Permit NumberBLD13-01782
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1500
Project Name8TH & MAIN STE 1500
Customer NumberREF BLD13-01691
ePlanReviewNo
Description
(HOLLAND & HART – 8th & Main Building – Suite # 1500) This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time the entire 16,828 square foot 15th floor (Shell and Core done under BLD12-01991) as offices. Work is to include: [construction of interior none bearing walls to create; 43 offices, 8 open office areas, 4 small storage area, two conference rooms (under 400 sq. ft), a coffee / break room, and two copy/print areas], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: Reference ePlanReview case BLD13-01691 for review. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection2/10/20142/11/20142/11/2014APASS
DetailsForrest France
Fire life safety walkthrough passed.
BLD-Final2/10/20142/11/20142/11/2014APASS
DetailsDave Hannah
Final inspection request of H&H 15th Floor. Adam will walk with you for this inspection. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference2/4/20142/5/20142/5/2014APEND
DetailsDave Hannah
Meet and walk H&H floors for egress signage compliance. Contact Adam or Murph. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection1/17/20141/21/20141/21/2014PPART
DetailsJim Sly
15th Floor Ceiling Grid inspection, Holland and Hart. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Install Perimeter only.....OK
BLD-Ceiling Grid Inspection1/7/20141/8/20141/9/2014PPART
DetailsDave Hannah
Ceiling Grid Inspection request Per Murph. PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to place bourder tiles in.
BLD-Ceiling Grid Inspection12/27/201312/30/201312/31/2013PPART
DetailsDave Hannah
Ceiling inspection, 15th Floor Holland and Hart, requested for PM Monday, by Murph. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson hard lids each side of elevator lobby ok to cover
BLD-Conference11/4/201311/5/201311/5/2013APASS
DetailsDave Hannah
15th Floor Framing inspection, request for cover via Murph. Thanks. Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/24/201310/24/201310/24/2013APART
DetailsDave Hannah
Inspection scheduled via John Woods. Adam is off site this morning, contact John for inspection needs. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson all the rest of the office on the out perm ok to cover
BLD-Framing/Rough-in10/1/201310/1/201310/3/2013PPART
DetailsDave Hannah
H&H Framing Inspection, 15th Floor. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover rooms 1###-#### and 1###-####
BLD-Framing/Rough-in9/20/20139/23/20139/23/2013APART
DetailsDave Hannah
Adam-inspection for the stairway between 16th & 17th floor Phone #: ###-####
BLD-Framing/Rough-in9/5/20139/5/20139/6/2013PPART
DetailsDave Hannah
Dave, Please inspect 15th Floor Perimeter Soffit framing. Thanks. Adam ESI. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to insulate top of ext walls