Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD13-01792
StatusFinaled
Name STEED CONSTRUCTION
Site Address 601 W GOWEN RD
Project NameWPS Warehouse Expansion
Customer Number 
ePlanReviewYes
Description
Western Power Sports - Warehouse Addition - To construct a new 60,000 square foot insulated tilt-up concrete warehouse addition to the south end of the existing building. The new addition will connect with an existing metal building to the west attaching it to main builidng and creating one structure of 247,870 sq. ft. The south exterior wall of the existing metal building will be removed. An ESFR sprinkler system and suspended ceiling for in rack storage including tires will be installed. New accessible restrooms are also being construction at a portion of the existing warehouse, south of the wall at grid line D. This permit also includes related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. This is an unlimited area building. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsJim Storey
Odie Phone #: ###-####
BLD-Final9/16/20149/17/20149/17/2014ANR
DetailsJim Storey
Odie Phone #: ###-####
FIRE-Final Inspection9/15/20149/16/20149/16/2014PPASS
DetailsForrest France
Noted correction items finished. Fire life safety final approved.
FIRE-Final Inspection9/3/20149/4/20149/4/2014APART
DetailsForrest France
EM light and exit sign repairs completed per contractor.
FIRE-Final Inspection8/12/20148/15/20148/19/2014APART
DetailsForrest France
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
FIRE-Final Inspection8/12/20148/15/20148/19/2014APART
DetailsForrest France
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
FIRE-Final Inspection7/7/20147/8/20147/8/2014PPART
DetailsForrest France
Intended for an on site conference regarding exit sign locations at the new racking area.
BLD-Framing/Rough-in4/14/20144/14/20144/14/2014PPASS
DetailsJim Storey
Odie-also breeze-way Phone #: ###-#### pending others. ok
BLD-Ceiling Grid Inspection4/14/20144/14/20144/14/2014PPASS
DetailsJim Storey
Odie Phone #: ###-####
BLD-Framing/Rough-in12/30/201312/30/201312/30/2013PPASS
DetailsJim Storey
odie Phone #: ###-#### roof deck and parapet ok insulation ok