BLD-Conference | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####. ok for perm occ.
No Mechanical needed per MIke Jordan///cdp
|
BLD-Conference | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | NR |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Needs special inspection on bolting and final letter from special inspection agency. Also needs plumbing final.
|
FIRE-Final Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Roadway surface has been approved.
|
FIRE-Final Inspection | 2/5/2015 | 2/5/2015 | 2/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Paul and Scott are working out the details of the fire dept access still.
|
FIRE-Sprinkler Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide approval from plan review for the road surface change, remove thumbturn dead bolts and provide annual inspection tag for fire extinguishers.
|
BLD-Final | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | NR |
Mike Jordan
|
|
|
Paul ###-####. Needs plumbing and fire/life/afety finals. Contacte and spoke to paul regaurding open perkits.
|
BLD-Framing/Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | NR |
Tom Arcoraci
|
|
|
paul Phone #: ###-#### per plan
|
BLD-Foundation | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Tom Arcoraci
|
|
|
Paul Phone #: ###-####
|
BLD-Foundation | 1/21/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Tom Arcoraci
|
|
|
paul Phone #: ###-####
|