BLD-Final | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/2/2014 | 5/5/2014 | 5/5/2014 | P | PASS |
Forrest France
|
|
|
For previous correction items listed per C. Hanson
|
FIRE-Final Inspection | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | FAIL |
Craig D. Hanson
|
|
|
1. #'s need posted on outside of building. 2. Exit signs w/bug eyes need added (total 3) 3. Fire extinguisher needs mounted and serviced 4.Door hung wrong way as per plan and needs to be changed towards the egress route. 5. "doors to remain unlocked..." signs to be added (x3)
|
BLD-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 | P | NR |
Mike Jordan
|
|
|
Please call ahead to meet Eric on site for final - Eric Phone #: ###-####. Called and spoke to eric, noted that fire/life/safety final not yet completed and a zoning final is also required.
|
FIRE-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | FAIL |
Troy Cobbley
|
|
|
I left message on the contacts voice mail that I was on the way. Stopped at site and spoke to receptionist and Eric the dentist but they had no plans and it was the wrong Eric. No inpsection was performed. Eric Phone #: ###-####
|
BLD-Final | 1/16/2014 | 1/21/2014 | 1/22/2014 | A | NR |
Mike Jordan
|
|
|
call for access - Eric Phone #: ###-####. Called eric and left message, needs life/safety and zoning finals.
|
BLD-Framing/Rough-in | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Jim Storey
|
|
|
Chad Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 | P | PASS |
Mike Jordan
|
|
|
partial r/i -- Chad Phone #: ###-####. Interior wood framed wals for phase 1 ok.
|
BLD-Conference | 8/1/2013 | 8/2/2013 | 8/2/2013 | A | DONE |
Mike Jordan
|
|
|
9am .. chad Phone #: ###-####
|