Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-02038
StatusFinaled
Name SEIDL HOME CO INC
Site Address 3907 E BARBER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE B, STATEMENT OF SPECIAL INSPECTION ATTACHED, Permit for the construction of a new 3585 sq. ft., two story (first story 1962 sq. ft.)., (second story 1623 sq. ft.) single family dwelling with 6 bedrooms, and (3) 1/2 baths, approximately 190 sq. ft. of covered patio/porch and a 956 sq. ft. garage per the approved plans, prescriptive energy, attached engineering and 2 revised sets of engineering calculations, truss details, plan review report and any notations. SP-01 zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/12/20143/12/20143/12/2014PPASS
DetailsJim Sly
phil Phone #: ###-####
C/C issued.
DOC - Permit Finaled3/12/20143/12/20143/12/2014PPASS
DetailsJim Sly
BLD-Final3/11/20143/11/20143/11/2014PFAIL
DetailsJim Storey
phil Phone #: ###-#### fire stop garage ceilling/ b-vent on water heater to reduce clearance to conbustables.
BLD-Final3/10/20143/10/20143/10/2014PNR
DetailsJim Sly
Phil Phone #: ###-####
Need F/P final.
BLD-Energy code compliance11/6/201311/7/201311/7/2013APASS
DetailsJim Storey
Phil Phone #: ###-#### engineer letter pass isues/ truss co applied repair framing and insulation ok
BLD-Framing/Rough-in10/30/201310/30/201310/30/2013PFAIL
DetailsJim Storey
Phil Phone #: ###-#### gider truss a4 in backwards need fix// pe to address header back porch/ redesign interior sheer by fire place// web braces a/a4// engineer field reviewed fab weld note plan review.
BLD-Wall Bracing10/10/201310/10/201310/10/2013PPASS
DetailsTom Arcoraci
phil Phone #: ###-####
BLD-Foundation9/10/20139/10/20139/11/2013PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Footing9/6/20139/6/20139/6/2013PPASS
DetailsDave Hannah
adam Phone #: ###-####