Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-02071
StatusFinaled
Name TDS CONSTRUCTION INC
Site Address 510 N MILWAUKEE ST
Project NameMens Wearhouse
Customer Number 
ePlanReviewNo
Description
(MENS WEARHOUSE) Permit for interior tenant improvements to an existing 6,043 sq. ft. tenant space with work to include the removal of some interior nonbearing partition walls and dressing room areas and the installation of new dressing rooms to include one fully accessible dressing room and the installation of related interior finishes. Structural inspector to verify that the one hour exit corridor for exit #2 is maintained (no work is indicated at the existing corridor). This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/12/20142/13/20142/13/2014APASS
DetailsMike Jordan
Al Huerta Phone #: ###-####
DOC - Permit Finaled2/13/20142/13/20142/13/2014PPASS
DetailsMike Jordan
Certificate of completion issued.
FIRE-Final Inspection2/12/20142/12/20142/12/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in2/5/20142/5/20142/5/2014PPART
DetailsMike Jordan
Albert Phone #: ###-####. Interior steel stud walls for new storage room.
BLD-Framing/Rough-in2/4/20142/4/20142/4/2014PPASS
DetailsMike Jordan
for phase 3 // Al Phone #: ###-####. Interior steel stud framed walls ok.
BLD-Framing/Rough-in1/28/20141/28/20141/28/2014PPASS
DetailsMike Jordan
richard Phone #: ###-####. Phase 2 interior steel stud framed walls at north east portion of building and front column at main door. All screws were removed and and kickers added.
BLD-Framing/Rough-in1/27/20141/28/20141/28/2014AFAIL
DetailsMike Jordan
phase 2 - Richard Phone #: ###-####. Rermove screws from grid to top plate and install kickers to structure above.
BLD-Framing/Rough-in1/16/20141/16/20141/16/2014PPASS
DetailsMike Jordan
partial r/i for phase 1 // Richard Phone #: ###-####. interior steel stud walls for 5 way mirror dressing rooms, phase 1.
BLD-Framing/Rough-in1/8/20141/9/20141/9/2014APART
DetailsMike Jordan
phase 1 framing - Richard Phone #: ###-####. phase 1, interior steel stud framed walls for new storefront showcases. Pending electrical rough in inspection.