Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02112
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1300
Project NameParsons, Behle and Latimer
Customer Number 
ePlanReviewYes
Description
(PARSONS, BEHLE & LATIMER - 8TH & MAIN BUILDING - 13TH STORY) The fire sprinkler system is used for high-rise. To construct a 15,535 square foot whole story office tenant space located on the 13th story of a high-rise building. There are 2 egress areas. One has a floor area of about 3,175 square feet and one has a floor area of about 12,360 square feet. Work is to include interior nonbearing walls, interior windows, interior doors, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20141/16/20141/16/2014PPASS
DetailsJim Sly
13th floor final with Roger W. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
OK for Perm Occ.
FIRE-Final Inspection1/16/20141/16/20141/16/2014PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final1/14/20141/15/20141/16/2014PNR
DetailsDave Hannah
Final walk request by Roger Wilson, walk with Dave H. 13th Floor PB&L. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/14/20141/15/20141/15/2014APART
DetailsForrest France
Fire Final Prewalk with Forrest, requested by Roger Wilson, 13th Floor PB&L. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection12/11/201312/11/201312/12/2013PPASS
DetailsDave Hannah
Ceiling cover inspection on 13th Floor PB&L, per Roger W. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/27/201310/28/201310/28/2013APASS
DetailsTom Arcoraci
Fireproof patch inspection requested per Roger Wilson, ESI, on 13th Floor. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference10/3/201310/4/201310/7/2013APASS
DetailsDave Hannah
Follow up from yesterday, conformation of FP at perimeter, thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/2/201310/3/201310/7/2013APASS
DetailsDave Hannah
Framing Inspection Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/1/201310/1/201310/7/2013PPASS
DetailsDave Hannah
PB&L Framing Inspection, 13th Floor. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson