BLD-Final | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-#### call garage code if not there
|
DOC - Permit Finaled | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | DONE |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Energy code compliance | 12/3/2013 | 12/4/2013 | 12/5/2013 | P | PASS |
Dave Hannah
|
|
|
As late as possible please *Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 12/2/2013 | 12/2/2013 | 12/3/2013 | P | PART |
Dave Hannah
|
|
|
josh PLEASE call before going out Phone #: ###-#### ok to insulate needs fire blocking and two scabs on trusses
|
BLD-Wall Bracing | 12/2/2013 | 12/2/2013 | 12/3/2013 | P | PASS |
Dave Hannah
|
|
|
josh PLEASE call before going out Phone #: ###-####
|
BLD-Framing/Rough-in | 11/26/2013 | 11/27/2013 | 11/27/2013 | P | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, c/n on back of permit card,, walk through conf only,, need mech pass,, do not insulate
|
BLD-Wall Bracing | 11/26/2013 | 11/27/2013 | 11/27/2013 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, renail per plan
|
BLD-Foundation | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PASS |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 9/18/2013 | 9/19/2013 | 9/19/2013 | P | PASS |
Dave Hannah
|
|
|
MANA Phone #: ###-####
|
BLD-Footing | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | NR |
Dave Hannah
|
|
|
Mana Phone #: ###-#### no inspection done need geo tect sign off
|
BLD-Foundation | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Dave Hannah
|
|
|
Requests around 2/basement wall - Mana Phone #: ###-####
|
BLD-Footing | 8/30/2013 | 9/3/2013 | 9/3/2013 | A | PASS |
Dave Hannah
|
|
|
mana Phone #: ###-####
|
BLD-Footing | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | CANC |
Dave Hannah
|
|
|
mana Phone #: ###-####
|