Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD13-02186
StatusIssued
Name MONTALBANO PAUL J
Site Address 526 E ORION CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE A, FIRE SPINKLERS REQUIRED, PLAN MODIFICATION 8/24/15 ADDITION OF 500SQ FTO STORAGE ROOM WITH DECK ABOVE, SUB GRADE INSPECTION REQUIRED PRIOR TO APPROVAL OF FOOTING INSPECTION. SUBMIT CHAIR FOR RAISED DECK FOR STRUCTURAL REVIEW. AJS**SEE ATTACHED PLAN REVIEW REPORT FOR ADDITIONAL CONDITIONS OF APPROVAL AND COMMENTS, LETTER ON POOL LANDSCAPING/GUARDRAILS, Plan Modification to add 308 sq ft of dwelling space in basement area under outside kitchen. 6/4/15 **ajs**Permit for the construction of a new 10,525 sq. ft., two story (basement level 2,533 sq. ft., main level 5,287 sq. ft., upper level 2,225 sq. ft.) single family dwelling with 8 bedrooms, 8 bathrooms, approximately 3,330 sq. ft. of covered patio/porch and a 2,272 sq. ft. attached garage per the approved plans, plan review report, structural calculations, geo tech report, evaluation report for spray foam insulation, letter on pool guardrails, and any notations. R-1A zoning and setbacks per planning. AJS

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/19/20206/19/20206/25/2020 PEND
DetailsTony Young
BLD-Final3/10/20203/24/20203/24/2020PNR
DetailsDave Hannah
Mark Phone #: ###-#### still needs pw
BLD-Final3/6/20203/10/20203/10/2020PPEND
DetailsTony Young
Mark Phone #: ###-####
BLD-Final2/25/20203/3/20203/6/2020PPEND
DetailsTony Young
Mark Phone #: ###-####
BLD-Final2/19/20202/21/20202/25/2020PPEND
DetailsTony Young
Mark Phone #: ###-####,, ok pending PW hillside approval
BLD-Final2/12/20202/13/20202/19/2020APEND
DetailsTony Young
Mark Phone #: ###-####
BLD-Final2/6/20202/12/20202/14/2020PPEND
DetailsTony Young
Mark Phone #: ###-####
BLD-Final1/31/20202/4/20202/6/2020APART
DetailsTony Young
Mark Phone #: ###-####// got ok from Ron Johnson (fire) that drive is ok for now due to house is fully sprinklered and hard pack on sand and proximity on home// still needing final bond on revegitation approval from PW
BLD-Final1/29/20201/31/20201/31/2020PPEND
DetailsTony Young
Mark Phone #: ###-####,, ok pending hillside
BLD-Conference1/22/20201/24/20201/24/2020PPART
DetailsTony Young
Marc; Phone #: ###-####//./ walk through on final
BLD-Aging Inspection12/13/201912/13/201912/19/2019 PASS
DetailsTony Young
BLD-Conference12/13/201912/13/201912/13/2019PPASS
DetailsTony Young
status// work in progress,, ok
BLD-Aging Inspection7/26/20197/26/20198/1/2019 PASS
DetailsTony Young
BLD-Wall cover3/13/20193/14/20193/14/2019APASS
DetailsTony Young
dry wall- Paul Phone #: ###-####,, garage interior drywall
BLD-Wall cover3/11/20193/13/20193/13/2019APART
DetailsTony Young
dry wall- Paul Phone #: ###-####,, work in progress on garage walls,, using glue and screws
BLD-Aging Inspection11/21/201811/21/201811/26/2018 PEND
DetailsTony Young
BLD-Aging Inspection11/20/201811/20/201811/26/2018 PASS
DetailsTony Young
BLD-Conference10/8/201810/8/201810/8/2018PPART
DetailsTony Young
Mark Phone #: ###-####,, soffit ?s,, general walk through
BLD-Conference7/18/20187/19/20187/19/2018APART
DetailsTony Young
Mark- for the building barbeque setback requirements for combustible services Phone #: ###-####,, per manf specs
BLD-Framing/Rough-in7/9/20187/9/20187/9/2018PPASS
DetailsTony Young
Pool mec room framing - Mark Phone #: ###-####
BLD-Framing/Rough-in6/13/20186/14/20186/14/2018APART
DetailsTony Young
framing for outdoor pool bathroom // Mark Phone #: ###-####,, ok pending trades
BLD-Conference5/30/20185/31/20185/31/2018APASS
DetailsTony Young
Mark Phone #: ###-####,, general ?s,, ok to frame walls in pool bath area
BLD-Conference4/18/20184/18/20184/19/2018PPASS
DetailsTony Young
Mark Ludlow Phone #: ###-####,, hand rail ?s
BLD-Conference2/28/20182/28/20182/28/2018PPASS
DetailsTony Young
Mark Phone #: ###-####,, walk through
BLD-Aging Inspection5/20/20165/20/20165/20/2016 PASS
DetailsTony Young
BLD-Aging Inspection5/19/20165/19/20165/20/2016 PASS
DetailsTony Young
BLD-Energy code compliance1/5/20161/6/20161/6/2016PPART
DetailsTony Young
Todd Phone #: ###-####,, all ok to cover pending trades approval,, draft stops in place
BLD-Energy code compliance12/9/201512/10/201512/10/2015APART
DetailsMike Jordan
Tod Phone #: ###-####. Work in progress, basement. Also reviewed draft stop locations.
BLD-Framing/Rough-in12/7/201512/8/201512/8/2015APART
DetailsMike Jordan
Todd Phone #: ###-####. BAsement and main level. Needs to complete airseal pack, draftstopping and fireblocking.
BLD-Footing12/2/201512/2/201512/2/2015PPASS
DetailsJim Storey
Todd Phone #: ###-####
BLD-Energy code compliance10/7/201510/8/201510/8/2015APART
DetailsTony Young
Todd Phone #: ###-####,, upper level ok to cover
BLD-Framing/Rough-in9/23/20159/24/20159/24/2015APART
DetailsTony Young
Todd Phone #: ###-####,, upper floor ok to insulate
BLD-Framing/Rough-in9/1/20159/2/20159/2/2015PCANC
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Conference7/1/20157/2/20157/2/2015PDONE
DetailsDave Hannah
Todd Phone #: ###-#### thy have to install fire place as per manufacture aslo specker 1 hr boxs in soffits ok
BLD-Conference4/14/20154/15/20154/15/2015APART
DetailsTony Young
Todd Phone #: ###-####,, outdoor kitchen area soffit light boxes ok,, verify with TJI on headered out boxes
BLD-Conference2/2/20152/3/20152/3/2015APASS
DetailsTony Young
Tod Phone #: ###-####,, upper soffit light boxes ok
BLD-Conference11/21/201411/26/201412/1/2014ACANC
DetailsTony Young
Todd Phone #: ###-####-please call to meet
BLD-Conference11/18/201411/21/201411/21/2014ADEFR
DetailsTony Young
Todd Phone #: ###-####-please call to meet
BLD-Conference11/13/201411/18/201411/18/2014ADEFR
DetailsTony Young
Todd Phone #: ###-####-please call to meet
BLD-Conference11/12/201411/13/201411/13/2014ADEFR
DetailsTony Young
Todd Phone #: ###-####-please call to meet
BLD-Conference11/12/201411/12/201411/12/2014PPART
DetailsTony Young
Todd Phone #: ###-####-please call to meet,, wants to insulate a triple wall area cavity in the stair,, ok,, no trades involved
BLD-Foundation8/19/20148/20/20148/20/2014APASS
DetailsPhil Shearer
Bob Phone #: ###-####
BLD-Footing8/7/20148/8/20148/8/2014APASS
DetailsPhil Shearer
late AM // Bob Phone #: ###-####
plainter footing
BLD-Wall Bracing4/17/20144/17/20144/17/2014PPASS
DetailsTony Young
Bob Phone #: ###-####,, exterior ok to cover
BLD-Wall Bracing4/16/20144/17/20144/17/2014APASS
DetailsTony Young
Bob Phone #: ###-####,, exterior shear ok
BLD-Wall Bracing4/15/20144/16/20144/16/2014PPART
DetailsTony Young
Bob Phone #: ###-####,, 90% done,,, will come back in am
BLD-Other4/7/20144/7/20144/7/2014PPART
DetailsTony Young
Last pool retaining wall - Bob Phone #: ###-####
BLD-Footing3/27/20143/28/20143/28/2014APART
DetailsTony Young
BOB Phone #: ###-####,, PENDING SPECIAL INSPECTION REPORT
BLD-Footing3/26/20143/27/20143/27/2014ANR
DetailsTony Young
bob Phone #: ###-####
BLD-Foundation2/26/20142/27/20142/27/2014APART
DetailsTony Young
Bob Phone #: ###-####,, retaining wall ok
BLD-Footing2/19/20142/20/20142/20/2014APART
DetailsTony Young
Retaining wall - Bob Phone #: ###-####,, south west upper wall ftgs ok
BLD-Footing2/18/20142/19/20142/19/2014PPEND
DetailsTony Young
Retaining wall - Bob Phone #: ###-####,, need soils approval
BLD-Foundation2/10/20142/11/20142/11/2014APART
DetailsTony Young
bob -pour after lunch Phone #: ###-####,, S.I. on site
BLD-Footing1/31/20142/3/20142/3/2014APART
DetailsTony Young
bob Phone #: ###-####,, west side crawl area,,ok to pour if using cold weather provisions
BLD-Footing1/30/20141/31/20141/31/2014PPART
DetailsTony Young
bob Phone #: ###-####,, work in progess,, will cover forms and heat then pour Monday
BLD-Foundation1/22/20141/24/20141/24/2014APASS
DetailsTom Arcoraci
retaining wall // Bob Phone #: ###-####
BLD-Foundation1/21/20141/22/20141/22/2014APASS
DetailsTony Young
bob Phone #: ###-####,, garden seperation 2'9" wall ok
BLD-Footing1/21/20141/21/20141/21/2014PPASS
DetailsTom Arcoraci
###-####
BLD-Footing1/15/20141/17/20141/17/2014APEND
DetailsMike Jordan
bob Phone #: ###-####. Rebar ok. Needs subgrade approval from public works. No concrete is allowed at this time.
BLD-Foundation1/8/20141/9/20141/9/2014APART
DetailsTony Young
bob Phone #: ###-####,, retaing walls ok,,, work in progress
BLD-Foundation12/30/20131/2/20141/2/2014APART
DetailsTony Young
Bob Phone #: ###-####,, north garage and east portion of basement walls,, ok,, special inspector to be on site,, cold weather provisions in effect
BLD-Footing12/18/201312/18/201312/18/2013PPART
DetailsTony Young
lte afternoon - bob Phone #: ###-####,, garage ftgs.. w. in progress
BLD-Footing12/13/201312/16/201312/16/2013APASS
DetailsJim Storey
bob please call before going out Phone #: ###-####
BLD-Footing12/6/201312/9/201312/9/2013APEND
DetailsTony Young
Mud scheduled for 11-Bob Phone #: ###-####,, too cold to pour
BLD-Footing12/5/201312/6/201312/6/2013ACANC
DetailsTony Young
Mud scheduled for 11-Bob Phone #: ###-####
BLD-Foundation11/14/201311/14/201311/14/2013PPART
DetailsTony Young
Bob Phone #: ###-####,, tall walls,, work in progress
BLD-Footing10/18/201310/21/201310/21/2013APEND
DetailsTony Young
Bob-mid morning Phone #: ###-####,, pending special inspection reports
BLD-Footing10/17/201310/18/201310/18/2013APART
DetailsTony Young
Bob-late morning Phone #: ###-####,, basement footings,, 98 % done,, will have a special inspector on site for the pour on Monday,, 3500 psi concrete