BLD-Final | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | PASS |
Tom Arcoraci
|
|
|
was signed temp occ ok for perm occ
|
BLD-Final | 10/20/2013 | 10/21/2013 | 10/21/2013 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by derek cooper ok for perm occ
|
FIRE-Final Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 10/20/2013 | 10/21/2013 | 10/21/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need city approved plans, sticker at main exit, tag on fire extinguisher, battery backup for the exit sign at the main exit and approved single action hardware on the north exit door.
|
FIRE-Final Inspection | 10/18/2013 | 10/18/2013 | 10/18/2013 | P | CANC |
Troy Cobbley
|
|
|
Not ready for a final the contractor needed a cover inspection for the fire sprinklers
|
BLD-Ceiling Grid Inspection | 10/18/2013 | 10/18/2013 | 10/18/2013 | P | PASS |
Tom Arcoraci
|
|
|
derek Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2013 | 9/26/2013 | 9/26/2013 | P | PASS |
Jim Sly
|
|
|
Derek Phone #: ###-####
|