Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02237
StatusFinaled
Name EDGE BREWERY
Site Address 525 N STEELHEAD WAY
Project NameEDGE BREWERY
Customer Number 
ePlanReviewYes
Description
(EDGE BREWERY) To remodel an existing 14,012 square foot tenant space in an existing warehouse and office building for use as a Production Beer Brewery/Tavern/Restaurant. Work to include: Construct new interior partition walls to create new offices, commercial kitchen, men's and women's accessible restrooms, dining/bar room, brewery, and warehouse; install a new vestibule with new doors and associated exit door hardware; provide new exit signage and emergency egress illumination lighting per plans; related interior finishes in compliance with chapter 8 of the 2009 IBC; mechanical, plumbing, and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new certificate of occupancy is required to be obtained after all work has been inspected and approved. The maximum occupant load of the Bar/Restaurant room shall be 155 persons and shall be posted in a conspicuous place near the main exit. NOTE: This building is fully fire sprinklered for area increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20142/3/20142/3/2014APASS
DetailsMike Jordan
marcus Phone #: ###-####. ok for temp. occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection1/31/20142/3/20142/3/2014APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Conference1/14/20141/15/20141/15/2014ADONE
DetailsTroy Cobbley
I went over life safety requirements with Marcus, the owner. One additional exit discharge light is needed at the northwest exit door, additional fire extinguishers for the seating area and a K class for the kitchen. It appears that a sprinkler monitoring system is required but its existance on site could not be verified, Marcus is going to follow up. The new kitchen hood suppression system will need to be connected to this fire alarm system as well as a separate permit for the work. The fire sprinkler permit still needs to be finaled and the fire suppression permit needs to be tested and finaled. All other items appear to be ok.
BLD-Conference1/14/20141/15/20141/15/2014ADONE
DetailsMike Jordan
DAVE Phone #: ###-####
BLD-Framing/Rough-in1/15/20141/15/20141/15/2014APASS
DetailsMike Jordan
DAVE Phone #: ###-####