BLD-Final | 11/3/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Storey
|
|
|
Brady Phone #: ###-####
|
FIRE-Final Inspection | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | PART |
Jim Storey
|
|
|
rick Phone #: ###-#### smoke seal placment/ duchdoor/airline
|
FIRE-Final Inspection | 6/6/2014 | 6/9/2014 | 6/9/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given for the "in-fill" area. Life safety is complete in this area.
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Jim Storey
|
|
|
Craig Phone #: ###-#### need fire listing 3 hr posted above ceilling
|
BLD-Other | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PASS |
Jim Storey
|
|
|
fire wall under stairs // Rick Phone #: ###-#### south fire walls ok at stair 1 and 2 nd/ elv. ok/ all interior walls ok to cover.
|
BLD-Other | 3/21/2014 | 3/24/2014 | 3/24/2014 | A | PASS |
Jim Storey
|
|
|
rick - sheet rock - fire wall Phone #: ###-####
|
BLD-Other | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PASS |
Jim Storey
|
|
|
Fire wall insepction--Late morning please-Rick Phone #: ###-#### 2nd floor 5/8 three layer aplacation ok.
|
BLD-Framing/Rough-in | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PART |
Jim Storey
|
|
|
late afternoon - craig Phone #: ###-#### aming of 3 hr wall and core board ok to start 5/8 gyp.
|
BLD-Energy code compliance | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PASS |
Jim Storey
|
|
|
craig Phone #: ###-####
|
BLD-Conference | 3/5/2014 | 3/6/2014 | 3/6/2014 | P | PASS |
Jim Storey
|
|
|
rick - about 1 pm please Phone #: ###-####
|
BLD-Conference | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PASS |
Jim Storey
|
|
|
rick - 10am please Phone #: ###-#### reviewed 3 hr wall location and assembly type.
|
BLD-Concrete | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Jim Storey
|
|
|
RICK Phone #: ###-#### placed w/si
|
BLD-Footing | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Jim Storey
|
|
|
RICK - REBAR Phone #: ###-#### pending si report.
|
BLD-Foundation | 11/11/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Jim Storey
|
|
|
We need a Concrete Inspection. Phone #: ###-#### >> Inspection requested via web by Rick Slama south wall ok
|
BLD-Concrete | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-#### si and rebar ok storm drain incapsulated w/concrete per engineer.
|