FIRE-Final Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Fire extinguishers are placed but brackets will not be available for acouple of days.
|
BLD-Final | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Phil Shearer
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | CANC |
Phil Shearer
|
|
|
Ron Phone #: ###-####
|
BLD-Final | 5/15/2014 | 5/16/2014 | 5/16/2014 | P | PART |
Tom Arcoraci
|
|
|
Ron-wants temp co Phone #: ###-####
|
FIRE-Final Inspection | 5/8/2014 | 5/9/2014 | 5/9/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy for life safety is being given until the interior equipmetent has been installed and possible fire sprinkler modifications performed.
|
FIRE-Conference | 5/2/2014 | 5/5/2014 | 5/6/2014 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements with Mike. I deferred knox box location to the fire dept. I noted missing exit signs, building address and fire extinguisher and approval notes. Also project is not to be finaled until the interior equipment has been installed.
|
BLD-Framing/Rough-in | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | PASS |
Tom Arcoraci
|
|
|
Ron-Ceiling grid inspection please Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2014 | 4/4/2014 | 4/4/2014 | A | PASS |
Tom Arcoraci
|
|
|
Gayle Phone #: ###-####
|
BLD-Footing | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | PASS |
Tom Arcoraci
|
|
|
ron Phone #: ###-####
|
BLD-Foundation | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PASS |
Tom Arcoraci
|
|
|
Ron - Late AM Please Phone #: ###-####
|
BLD-Energy code compliance | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Tom Arcoraci
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PASS |
Tom Arcoraci
|
|
|
ron Phone #: ###-####
|
BLD-Foundation | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PEND |
Tony Young
|
|
|
ron Phone #: ###-####,, dock area,, west side,, pending special inspection report
|
BLD-Foundation | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PASS |
Tom Arcoraci
|
|
|
request first thing in AM .. Ron Phone #: ###-####
|
BLD-Footing | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
ron Phone #: ###-#### spec insp
|
BLD-Foundation | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Jim Sly
|
|
|
Ron-Please call at least 30 mins prior to inspection Phone #: ###-#### 80% of North wall...... Covered.......supplimental heat.
|
BLD-Foundation | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Mike Jordan
|
|
|
ron Phone #: ###-####. pEnding special inspection.
|
BLD-Foundation | 1/13/2014 | 1/15/2014 | 1/15/2014 | A | PART |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 1/13/2014 | 1/15/2014 | 1/15/2014 | A | PASS |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 12/31/2013 | 1/2/2014 | 1/2/2014 | A | PASS |
Jim Storey
|
|
|
Ron Phone #: ###-####
|
BLD-Conference | 12/23/2013 | 12/24/2013 | 12/24/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 12/20/2013 | 12/23/2013 | 12/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
ron Phone #: ###-####
|
BLD-Foundation | 12/18/2013 | 12/19/2013 | 12/19/2013 | A | PASS |
Tom Arcoraci
|
|
|
ron Phone #: ###-####
|
BLD-Concrete | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | PART |
Tom Arcoraci
|
|
|
ron Phone #: ###-####
|
BLD-Footing | 12/3/2013 | 12/5/2013 | 12/5/2013 | A | PART |
Tom Arcoraci
|
|
|
Ron Phone #: ###-#### spec inspector on site cold weather protection appears in place
|