BLD-Final | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Phil Shearer
|
|
|
Margo ###-####
|
DOC - Permit Finaled | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Other | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Dave Hannah
|
|
|
ryan - rebar Phone #: ###-#### rebar for spa ok after elec is oked.
|
BLD-Footing | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | FAIL |
Jim Storey
|
|
|
RYAN Phone #: ###-#### RYAN Phone #: ###-####,, need electrical inspection on bonding,, and soils report
|
BLD-Foundation | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | FAIL |
Tony Young
|
|
|
RYAN Phone #: ###-####,, need electrical inspection on bonding,, and soils report
|