Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD13-02416
StatusFinaled
Name BOISE CITY PUBLIC WORKS
Site Address 150 N CAPITOL BLVD
Project NameCity Hall Bldg # 1
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE – 3rd Floor Mayor’s Reception Room) Permit is to remodel City Hall Building #1 by adding a new balance door to an existing opening from the Mayor’s Reception Room. Approval per approved plans on file. Work to include: add storefront aluminum framing to an existing opening, install new balance door in framed opening, and interior finishes in compliance with chapter 8 of the 2009 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20147/28/20147/28/2014APASS
DetailsDave Hannah
Keith ###-####
DOC - Permit Finaled7/28/20147/28/20147/28/2014PPASS
DetailsDave Hannah
BLD-Final7/24/20147/24/20147/24/2014PPASS
DetailsTony Young
Please call at least 15 mins prior to inspection-Keith Phone #: ###-####
FIRE-Final Inspection7/24/20147/24/20147/24/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final7/10/20147/11/20147/11/2014ANR
DetailsDave Hannah
Kieth-call to meet Phone #: ###-####
FIRE-Final Inspection7/10/20147/11/20147/11/2014AFAIL
DetailsTroy Cobbley
Strobe coverage has been blocked by the new door. Provide additional coverage with-in 15'-0" of the end of the corridor including coverage in the pocket. See NFPA 72 18.5.5.5.5.

Smoke detector coveage has been blocked by the new door. Provide additional smoke detector coverage as per NFPA 72 17.5.3.1 and 17.6.3.1.1.

Provide city approved plans and small documents.