Information based on query as of Tuesday, May 21, 2024.
Permit Information
Permit NumberBLD13-02424
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1004 W ROYAL BLVD
Project NameRIVER EDGE APARTMENTS
Customer Number 
ePlanReviewNo
Description
(RIVER EDGE APARTMENTS - WEST WING) (x-ref expired permit BLD12-00320) **4/21/15 PLAN MODIFICATION TO INCLUDE: PROVIDE AN EXTERIOR GENERATOR FOR A SECONDARY STANDBY POWER SYSTEM FOR THE CONTINUOUSLY OPERABLE EXHAUST FANS REQUIRED FOR THE SUBDUCT METHOD; PROVIDE A 1-HOUR ENCLOSED ROOM FOR THE POWER CONTROLS ON THE 5TH FLOOR; AND ELECTRICAL WORK AS REQUIRED. SRZ ** The west wing consists of four floors of 29,546 sq. ft. each, a total area of 118,184 sq. ft. with (84) dwelling units [(16)-2-BR apartments (4 per floor) and (68) - 4BR apartments (17 per floor)]. All 2-BR units exceed 800 Sq. ft. in area and all 4-BR units exceed 1,100 sq. ft. in area. The east and west wings of the residential floors are divided by a 2-hour fire wall / horizontal exit assembly, extending from the top of 3-hour concrete floor to the underside of the roof deck sheathing, with fire retardant plywood deck extending 4 feet on each side of fire wall in place of a parapet. The dwelling units are separated from the parking area on the 1st level by a 3-hour fire-resistive horizontal floor/ceiling assembly. This allows the parking garage and the residential units above to each be considered as a separate building for code compliance. The installation of an NFPA 13 fire sprinkler system is required throughout this building and is used for allowable area increase and for an additional story. All construction shall be per the approved plans, red-lined notes and all attached plan reviewer's comments / conditions reports. drs DRH12-00013, CUP11-00090, CFH11-00036
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/201510/20/201510/20/2015APASS
DetailsJim Storey
perm occ ok
BLD-Final8/26/20158/27/20158/27/2015APASS
DetailsJim Storey
Level 5 inspection for Temp C of O, all other inspections are complete. Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Final8/24/20158/25/20158/25/2015PNR
DetailsJim Storey
level 5 final inspection for C of O Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Final8/18/20158/19/20158/19/2015APASS
DetailsJim Storey
Final walk on rooms 360, 460,, 356, 456, 350, 450 at 10 am Phone #: ###-#### Inspection requested via web by Mike Wilson pending 5th floor as directed.
BLD-Final8/17/20158/18/20158/18/2015PNR
DetailsJim Storey
finish the building walk on items to complete for Temp sign off 1 pm Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Conference8/13/20158/14/20158/14/2015ANR
DetailsJim Storey
McAlvain''s Main office would like to get a preliminary walk thru with Jim to make sure we are ready for Temp C of O Early next week Phone #: ###-#### Inspection requested via web by Mike Wilson pending letter for scope.
BLD-Ceiling Grid Inspection8/13/20158/14/20158/14/2015APASS
DetailsJim Storey
Level 5 hallway ceiling for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
FIRE-Conference8/13/20158/14/20158/14/2015ADONE
DetailsThomas Walsh
Met with Elect. contractors to look at exit signage and emergency lighting for the 5 story bldg. Added a few exit signs in the parking garage to improve identification of egress paths, and added about 6/floor emergency lights in the corridors for the above floors.
BLD-Ceiling Grid Inspection8/4/20158/5/20158/5/2015APART
DetailsJim Storey
Level 4 hallways east and west for cover, level 2, 3 and 4 elevator lobbies for cover Phone #: ###-#### Inspection requested via web by Mike Wilson as noted on site
BLD-Ceiling Grid Inspection8/3/20158/4/20158/4/2015PDEFR
DetailsJim Storey
Level 4 hallways east and west for cover, level 2, 3 and 4 elevator lobbies for cover Phone #: ###-#### Inspection requested via web by Mike Wilson out of time
FIRE-Conference8/3/20158/3/20158/4/2015PDONE
DetailsThomas Walsh
\Meeting with GC and Elect. contractor to review exit signs for clubhouse, corridors, and parking garage. See plans for areas where additional signs are required, and where exit signs need to be relocated.
BLD-Wall cover7/31/20157/31/20158/3/2015PPASS
DetailsJim Sly
level 5 fire caulking in the drop ceiling around fire sprinkle main in hallway Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Ceiling Grid Inspection7/28/20157/29/20157/29/2015APASS
DetailsJim Storey
Level 2 and 3 hallway inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Ceiling Grid Inspection7/27/20157/28/20157/28/2015PPART
DetailsJim Storey
level 2 and 3 hallways Phone #: ###-#### Inspection requested via web by Mike Wilson firestopping required
BLD-Wall cover7/21/20157/22/20157/22/2015PPASS
DetailsJim Storey
Level 5 drop ceilings for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover7/20/20157/21/20157/21/2015APASS
DetailsJim Storey
level 5 drops in units on West Phone #: ###-#### Inspection requested via web by Mike Wilson per list on site
BLD-Wall cover7/10/20157/10/20157/10/2015PPASS
DetailsJim Storey
ceilling drops per list on site
BLD-Wall cover7/10/20157/10/20157/10/2015PNR
DetailsJim Storey
20 drop ceilings on level 5 for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover6/29/20156/30/20156/30/2015APASS
DetailsJim Storey
level 4 west fire caulking in drop ceiling Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover6/25/20156/26/20156/26/2015PNR
DetailsJim Storey
level 5 shaft framing Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance6/22/20156/23/20156/23/2015PPASS
DetailsJim Storey
Level 5 West perimeter walls Phone #: ###-#### Inspection requested via web by Mike Wilson ok to cover
BLD-Energy code compliance6/11/20156/12/20156/12/2015APASS
DetailsDave Hannah
Level 4 west energy code perimeter walls Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance6/10/20156/11/20156/12/2015PNR
DetailsDave Hannah
Level 4 West perimeter wall energy code and insulation Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Framing/Rough-in5/26/20155/27/20155/27/2015PPASS
DetailsJim Storey
Level 4 West unit framing, Stairwell B, C and D for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance5/21/20155/22/20155/22/2015ACANC
DetailsJim Storey
Level 3 west perimeter wall insulation inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilsonsoffits ok lev2 east
BLD-Framing/Rough-in5/11/20155/12/20155/12/2015APASS
DetailsJim Storey
Level 3 West unit framing, West side roof truss engineering and framing inspection. Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance5/5/20155/6/20155/6/2015PPASS
DetailsJim Storey
###-####-Mike-level 2 west/ center ele e ok to cover c/n made ok
BLD-Conference4/13/20154/14/20154/14/2015PPASS
DetailsJim Storey
West side roofing nailing inspection Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Framing/Rough-in3/30/20153/31/20153/31/2015PPASS
DetailsJim Storey
Level 2 and 3 Corridor ceiling framing for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Framing/Rough-in3/25/20153/27/20153/27/2015PPART
DetailsDave Hannah
More roof sheathing inspection for roof cover over the weekend Phone #: ###-#### Inspection requested via web by Mike Wilson roof sheeting eastside of ph one ok to cover.