BLD-Final | 10/20/2015 | 10/20/2015 | 10/20/2015 | A | PASS |
Jim Storey
|
|
|
perm occ ok
|
BLD-Final | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Jim Storey
|
|
|
Level 5 inspection for Temp C of O, all other inspections are complete. Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Final | 8/24/2015 | 8/25/2015 | 8/25/2015 | P | NR |
Jim Storey
|
|
|
level 5 final inspection for C of O Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Final | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Jim Storey
|
|
|
Final walk on rooms 360, 460,, 356, 456, 350, 450 at 10 am Phone #: ###-#### Inspection requested via web by Mike Wilson pending 5th floor as directed.
|
BLD-Final | 8/17/2015 | 8/18/2015 | 8/18/2015 | P | NR |
Jim Storey
|
|
|
finish the building walk on items to complete for Temp sign off 1 pm Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Conference | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | NR |
Jim Storey
|
|
|
McAlvain''s Main office would like to get a preliminary walk thru with Jim to make sure we are ready for Temp C of O Early next week Phone #: ###-#### Inspection requested via web by Mike Wilson pending letter for scope.
|
BLD-Ceiling Grid Inspection | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | PASS |
Jim Storey
|
|
|
Level 5 hallway ceiling for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
FIRE-Conference | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | DONE |
Thomas Walsh
|
|
|
Met with Elect. contractors to look at exit signage and emergency lighting for the 5 story bldg. Added a few exit signs in the parking garage to improve identification of egress paths, and added about 6/floor emergency lights in the corridors for the above floors.
|
BLD-Ceiling Grid Inspection | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PART |
Jim Storey
|
|
|
Level 4 hallways east and west for cover, level 2, 3 and 4 elevator lobbies for cover Phone #: ###-#### Inspection requested via web by Mike Wilson as noted on site
|
BLD-Ceiling Grid Inspection | 8/3/2015 | 8/4/2015 | 8/4/2015 | P | DEFR |
Jim Storey
|
|
|
Level 4 hallways east and west for cover, level 2, 3 and 4 elevator lobbies for cover Phone #: ###-#### Inspection requested via web by Mike Wilson out of time
|
FIRE-Conference | 8/3/2015 | 8/3/2015 | 8/4/2015 | P | DONE |
Thomas Walsh
|
|
|
\Meeting with GC and Elect. contractor to review exit signs for clubhouse, corridors, and parking garage. See plans for areas where additional signs are required, and where exit signs need to be relocated.
|
BLD-Wall cover | 7/31/2015 | 7/31/2015 | 8/3/2015 | P | PASS |
Jim Sly
|
|
|
level 5 fire caulking in the drop ceiling around fire sprinkle main in hallway Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Ceiling Grid Inspection | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Jim Storey
|
|
|
Level 2 and 3 hallway inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Ceiling Grid Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 | P | PART |
Jim Storey
|
|
|
level 2 and 3 hallways Phone #: ###-#### Inspection requested via web by Mike Wilson firestopping required
|
BLD-Wall cover | 7/21/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Jim Storey
|
|
|
Level 5 drop ceilings for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Wall cover | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Jim Storey
|
|
|
level 5 drops in units on West Phone #: ###-#### Inspection requested via web by Mike Wilson per list on site
|
BLD-Wall cover | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | PASS |
Jim Storey
|
|
|
ceilling drops per list on site
|
BLD-Wall cover | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | NR |
Jim Storey
|
|
|
20 drop ceilings on level 5 for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Wall cover | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Jim Storey
|
|
|
level 4 west fire caulking in drop ceiling Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Wall cover | 6/25/2015 | 6/26/2015 | 6/26/2015 | P | NR |
Jim Storey
|
|
|
level 5 shaft framing Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Energy code compliance | 6/22/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Jim Storey
|
|
|
Level 5 West perimeter walls Phone #: ###-#### Inspection requested via web by Mike Wilson ok to cover
|
BLD-Energy code compliance | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Dave Hannah
|
|
|
Level 4 west energy code perimeter walls Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Energy code compliance | 6/10/2015 | 6/11/2015 | 6/12/2015 | P | NR |
Dave Hannah
|
|
|
Level 4 West perimeter wall energy code and insulation Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Framing/Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Jim Storey
|
|
|
Level 4 West unit framing, Stairwell B, C and D for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Energy code compliance | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | CANC |
Jim Storey
|
|
|
Level 3 west perimeter wall insulation inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilsonsoffits ok lev2 east
|
BLD-Framing/Rough-in | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PASS |
Jim Storey
|
|
|
Level 3 West unit framing, West side roof truss engineering and framing inspection. Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Energy code compliance | 5/5/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Jim Storey
|
|
|
###-####-Mike-level 2 west/ center ele e ok to cover c/n made ok
|
BLD-Conference | 4/13/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Jim Storey
|
|
|
West side roofing nailing inspection Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Framing/Rough-in | 3/30/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Jim Storey
|
|
|
Level 2 and 3 Corridor ceiling framing for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Framing/Rough-in | 3/25/2015 | 3/27/2015 | 3/27/2015 | P | PART |
Dave Hannah
|
|
|
More roof sheathing inspection for roof cover over the weekend Phone #: ###-#### Inspection requested via web by Mike Wilson roof sheeting eastside of ph one ok to cover.
|