BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | NR |
Jim Sly
|
|
|
jason Phone #: ###-#### Need Mech. and Plumb. finals.
|
FIRE-Final Inspection | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | CANC |
Craig D. Hanson
|
|
|
request 8:30 am // Jason Phone #: ###-####. Canceled by Jason 11/01
|
FIRE-Final Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | FAIL |
Troy Cobbley
|
|
|
life safety will be ok to pass when the project related fire alarm permit has been addressed.
|
BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Jim Sly
|
|
|
Ceiling grid insepction please-Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### Long..... East to West partiotion wall OK to cover.
|