Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02584
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 813 S VISTA AVE
Project NameVista Bar Addition
Customer Number 
ePlanReviewYes
Description
(VISTA BAR ADDITION) MODIFICATION TO REMOVE THE PARAPET FROM THE NORTH WALL. Permit for the construction of a 945 sq. ft. addition to an existing 2,545 sq. ft. bar with work to include the removal of a portion of the A-Frame roof to provide an opening between the new and existing structures, construction of the new wood framed addition and minor exterior improvements per hte approved pan, attached engineering and any notations. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/21/20144/21/20144/21/2014PPASS
DetailsForrest France
Life safety final approved.
FIRE-Final Inspection4/21/20144/21/20144/21/2014PPASS
DetailsForrest France
Previous correction items completed and verified.
BLD-Final4/21/20144/21/20144/21/2014PPASS
DetailsTom Arcoraci
Mike ###-#### ok for perm
BLD-Final2/24/20142/25/20142/25/2014APART
DetailsTom Arcoraci
Mike Phone #: ###-#### ok for temp needs perm landing at rear door
FIRE-Final Inspection2/24/20142/25/20142/25/2014APART
DetailsForrest France
Fire life safety okay pending max. occupant sign is posted, manual thumbturn at the main entry/exit is removed, post signage at the main entry "door to remain unlocked....", landing is not yet complete at the back exit. Note* items to be completed prior to structural final.
BLD-Energy code compliance1/29/20141/29/20141/29/2014PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in1/28/20141/29/20141/29/2014APASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Framing/Rough-in1/21/20141/22/20141/22/2014APART
DetailsMike Jordan
partial - mike Phone #: ###-####. ok to rock mechanical wall for furnace, pending electrical.
BLD-Conference1/8/20141/9/20141/9/2014APASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Conference12/26/201312/26/201312/26/2013PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Concrete12/11/201312/11/201312/11/2013PCANC
DetailsTom Arcoraci
BLD-Foundation12/9/201312/10/201312/10/2013APASS
DetailsTom Arcoraci
Dan Phone #: ###-####
BLD-Foundation12/6/201312/9/201312/9/2013ACANC
DetailsTom Arcoraci
dan Phone #: ###-####
BLD-Footing12/3/201312/3/201312/3/2013PPART
DetailsJim Storey
Dan Phone #: ###-#### ext ft ok