Permit Information
Permit NumberBLD13-02585
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 210
Project NameZenergy Athletic Club
Customer Number 
ePlanReviewYes
Description
(ZENERGY ATHLETIC CLUB)(8TH & MAIN BLDG - SUITE 210)(PLAN MODIFICATION includes...) This permit includes the gym and group fitness area in suite 220 and the office/mercantile/locker room located in suite 210. Tenant improvement plans include nonbearing noncombustible walls to create the 2,793 sq ft gym, 1,116 sq ft group fitness, 318 sq ft boutique, 5 offices 2 locker room and a family assist restroom. The non-rated corridor construction is included in this tenant improvement. Scope of work includes associated plumbing, mechanical and electrical work. New suspended ceilings and hard ceilings in the rest room and locker rooms will be constructed. There is access to the parking garage between the two suites however this is not an exit. The drinking fountain and floor sink are fixtures are utilized from the core area. Special inspection required for Aspen Tree Wall as per plans and documents. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. All high-rise fire and life safety systems must also be installed and operational before occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **AJS**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20142/27/20142/27/2014PPASS
DetailsDave Hannah
Adam - call for access Phone #: ###-####
BLD-Final2/24/20142/26/20142/26/2014PPART
DetailsDave Hannah
Final BLD inspection request, coordinate with Korey or Adam for walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok for temp occ
FIRE-Final Inspection2/24/20142/26/20142/26/2014APASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection2/19/20142/19/20142/20/2014PPASS
DetailsDave Hannah
Ceiling grid inspection. 2nd half requested by Kory, second floor Zenergy t.i. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection2/14/20142/14/20142/19/2014PPART
DetailsDave Hannah
Ceiling inspection walk of Zenergy, 2nd floor. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover hallways
BLD-Ceiling Grid Inspection2/6/20142/7/20142/7/2014APASS
DetailsDave Hannah
Follow up to on site ceiling grid inspection, follow up of added wires requested by Dave Hannah. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference1/7/20141/7/20141/9/2014PPART
DetailsDave Hannah
adam Phone #: ###-#### fire proofing ok ok to cover all walls
BLD-Framing/Rough-in12/27/20131/2/20141/3/2014APASS
DetailsDave Hannah
Adam @ ###-####