Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-02618
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5604 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2390 sq. ft., two story (first story 1106 sq. ft., second story 1284 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, 126 sq. ft. of covered patio/porch; 55s.f. upper level deck and a 576 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. pep A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20148/8/20148/8/2014PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled8/8/20148/8/20148/8/2014PPASS
DetailsPhil Shearer
BLD-Energy code compliance4/29/20145/5/20145/5/2014APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/29/20145/1/20145/1/2014APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/21/20144/21/20144/21/2014PPART
DetailsTom Arcoraci
Clint Phone #: ###-#### can light sheet rocked
BLD-Other4/18/20144/21/20144/21/2014APASS
DetailsDave Hannah
sheet rock for fire rating in basement// Celo Phone #: ###-####
BLD-Wall Bracing4/7/20144/8/20144/8/2014PPASS
DetailsDave Hannah
Rudy Phone #: ###-####
BLD-Wall Bracing4/2/20144/3/20144/4/2014PPART
DetailsDave Hannah
Rudy Phone #: ###-#### ok to cover second level
BLD-Foundation10/29/201310/29/201310/29/2013PPASS
DetailsTom Arcoraci
will be ready at 2:30 // Juan Phone #: ###-####
BLD-Concrete10/28/201310/28/201310/28/2013PPASS
DetailsJim Sly
juan Phone #: ###-####
Footing subgrade OK'd by Jason Taylor.