BLD-Final | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
FIRE-Final Inspection | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety completed satisfactory. Inspection passed.
|
FIRE-Conference | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | DONE |
Forrest France
|
|
|
Regarding project finals.
|
BLD-Final | 3/18/2014 | 3/19/2014 | 3/20/2014 | A | PEND |
Dave Hannah
|
|
|
for temp // daryl Phone #: ###-#### ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is approved until the issues with the project related fire alarm permit have been resolved.
|
BLD-Ceiling Grid Inspection | 2/21/2014 | 2/24/2014 | 2/24/2014 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Dave Hannah
|
|
|
daryl - before 3 if possible Phone #: ###-####
|
BLD-Conference | 1/3/2014 | 1/6/2014 | 1/7/2014 | A | PART |
Dave Hannah
|
|
|
daryl - walk through prior to the final Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2013 | 11/18/2013 | 11/18/2013 | A | PART |
Dave Hannah
|
|
|
daryl Phone #: ###-#### ok to cover walls phase one of two
|