BLD-Final | 2/11/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
BLD-Blower Door Test Results | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Phil Shearer
|
|
|
4.6
|
DOC - Permit Finaled | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | NR |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
BLD-Energy code compliance | 11/14/2014 | 11/17/2014 | 11/17/2014 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 11/11/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Jim Storey
|
|
|
Joey Phone #: ###-####
|
BLD-Foundation | 12/4/2013 | 12/5/2013 | 12/5/2013 | P | FAIL |
Dave Hannah
|
|
|
antone - around 2 if possible please Phone #: ###-#### outside air temps are 23deg forms rebar ect same temp footing was not protected to aci 306 standerds and will need to be tested.avg temps are below 20deg crew is not using any type of heat insulated blankets only .ground temps are below 32deg talked with wes and jake I will not ok this as is they are pouring at thier own risk.
|
BLD-Footing | 12/3/2013 | 12/3/2013 | 12/4/2013 | P | PART |
Dave Hannah
|
|
|
anton - after 3 please Phone #: ###-####
|
BLD-Foundation | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | CANC |
Dave Hannah
|
|
|
Around 4 if possible please-Anton Phone #: ###-####
|