BLD-Final | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | PASS |
Dave Hannah
|
|
|
Gabriel Q Phone #: ###-####
|
BLD-Final | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PART |
Dave Hannah
|
|
|
Gabriel Phone #: ###-#### ok for temp occ needs to key lock front door
|
FIRE-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Forrest France
|
|
|
Panic hardware at the south exit doors is satisfactory. The north pair of exit doors still needs to have the manual thumbturn removed and provided with keyed locking hardware per IBC conditions- to be verified by structural inspector for compliance prior to final as discussed.
|
FIRE-Final Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PART |
Forrest France
|
|
|
Final pending door hardware at the main entry/exit as discussed. Verified annual certification of the existing fire sprinkler system.
|
BLD-Final | 3/18/2014 | 3/19/2014 | 3/20/2014 | P | NR |
Dave Hannah
|
|
|
Andrea Phone #: ###-#### needs fire final first
|
FIRE-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 | A | FAIL |
Forrest France
|
|
|
Items noted include; repair exit signs at the basement level, provide approved hardware at the main entry/exit doors, the fire sprinkler system is overdue annual certification.
|