Permit NumberBLD13-02810
StatusFinaled
Name CLEARY BUILDING CORP
Site Address 12400 W MCMILLAN RD
Project NameCentennial High School
Customer Number 
ePlanReviewNo
Description
(CENTENNIAL HIGH - Indoor Practice Batting Facility) To construct a new 3,024 square foot indoor batting facility for baseball and softball near the Southwest corner of the school property. This building is constructed of pressure treated (3) ply 2X6 columns, steel wall panels, 2X6 horizontal wall girts flat to columns, double wood girder trusses at 8' o.c., and prefinished metal roofing. Work to include: Construct the pre-engineered pole frame building per plans; construct a stable, firm, and slip resistant accessible route; install interior means of egress and exterior exit discharge lighting; and related site improvements. All work per the approved plans, engineering, attached plan review report, and all other reviewing agencies approvals. This building is not fire sprinkled. All construction shall be per the approved plans, Engineering, and attached comment list. A new Certificate of Occupancy with the occupant load total is to be issued when completed and approved prior to tenant occupying this building. This structure does not have fire sprinklers. CUP13-00041 **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/22/20141/23/20141/22/2014APASS
DetailsJim Sly
Dave Phone #: ###-####
OK for Perm Occ.
BLD-Final1/16/20141/17/20141/17/2014ANR
DetailsJim Sly
dave Phone #: ###-####
Need Mech. final. Dave says..... Brian from P/W signed card.
BLD-Framing/Rough-in1/15/20141/15/20141/15/2014PPASS
DetailsJim Sly
dave Phone #: ###-####
BLD-Final1/13/20141/14/20141/14/2014PNR
DetailsJim Sly
Daniel late pm if possible Phone #: ###-####
Need Public works, Mech, and Zoning Finals.
FIRE-Final Inspection1/14/20141/14/20141/14/2014PPASS
DetailsTroy Cobbley
Life safety passed. Curtains have not been installed yet to verify unobstructed access. I spoke to the contractor about the requirements per the approved drawings.
FIRE-Final Inspection1/13/20141/13/20141/13/2014PFAIL
DetailsTroy Cobbley
Provide exit signs and exit discharge lighting as per the approved plans
BLD-Footing12/19/201312/20/201312/20/2013APASS
DetailsJim Sly
dave Phone #: ###-####