Permit Information
Permit NumberBLD13-02860
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1250
Project Name8th & Main Ste# 1250
Customer Number 
ePlanReviewYes
Description
(MARSH & McLENNAN COMPANIES – 8th & Main Building – Suite # 1250) This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time a 2,311 square foot office space on the 11,250 square foot 12th floor (Shell and Core done under BLD12-01991). Work is to include: [construction of interior none bearing walls to create; a waiting / reception room, a 277 square foot conference room, 2 individual offices, an open office area, a file storage area, a phone room, a storage room, and a break room], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20142/21/20142/21/2014APASS
DetailsDave Hannah
Reinspection of MMC 12th Floor, Fire Final, Coordinate with Adam or Bob for inspection. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection2/20/20142/21/20142/21/2014APASS
DetailsForrest France
C/N items verified. Fire life safety passed. *Note- fire sprinkler coverage at the shell areas to be maintained at new demising walls as discussed on site.
BLD-Final2/19/20142/20/20142/20/2014PPEND
DetailsDave Hannah
Final walk MMC TI, 12th Floor. Coordinate with Adam or Bob for walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok after fire finals
FIRE-Final Inspection2/19/20142/20/20142/20/2014AFAIL
DetailsForrest France
C/N items include; repair one EM light at the main entry, replace missing ceiling tile, obstruction to fire sprinkler coverage at the server room, post suite address numbers, replace missing escutcheon at the conference room, check pendent sprinkler head at the east office adjacent to the server room for physical damage.
BLD-Ceiling Grid Inspection2/4/20142/4/20142/5/2014PPASS
DetailsDave Hannah
Request for Partial ceiling inspection, 12th floor MMC. VAV unit stalled in shipment, but would like to flood the rest of the suite. Please check in with Adam or Bob. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in12/16/201312/16/201312/17/2013PPASS
DetailsDave Hannah
Inspection request for MMC, 12th Floor, per Bob L. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson