BLD-Final | 3/20/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tony Young
|
|
|
Steve-PLease call at least 30 mins prior t o inspection Phone #: ###-####
|
DOC - Permit Finaled | 3/20/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/16/2013 | 12/16/2013 | 12/17/2013 | P | PART |
Dave Hannah
|
|
|
mark Phone #: ###-#### ok to cover upper area still need to check sub floor after beam hanger is installed
|
BLD-Framing/Rough-in | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok to insulate
|
BLD-Conference | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, frame ?s
|