BLD-Final | 3/19/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tom Arcoraci
|
|
|
nate Phone #: ###-####
|
FIRE-Final Inspection | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Aging Inspection | 3/14/2014 | 3/17/2014 | 3/20/2014 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/12/2014 | 2/13/2014 | 2/13/2014 | P | NR |
Jim Sly
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | NR |
Tom Arcoraci
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | CANC |
Troy Cobbley
|
|
|
Could not find city approved drawings on stie. Cancel per Nate Phone #: ###-####
|
BLD-Final | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy, per Jason Blaise, for the warehouse area is approved until the remaining work is complete.
|
BLD-Final | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | NR |
Tom Arcoraci
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | FAIL |
Troy Cobbley
|
|
|
I let Nate know that per Jason Blais the exit sign/emergency lights, hardware at the new double doors and the exterior stairs would need to be completed prior to a temporary occupancy approval for the warehouse area could be given. Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PART |
Mike Jordan
|
|
|
Nate Phone #: ###-####. Door infill framing at dock area and 3hr. wall extension at dock area, one side sheeted already. Contractor to provide RFI from architect for change in construction at 3hr. rated infill from CMU to steel stud framing.
|