DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 2/28/2014 | 3/3/2014 | 3/3/2014 | A | PASS |
Dave Hannah
|
|
|
shawn Phone #: ###-####
|
FIRE-Final Inspection | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Forrest France
|
|
|
Final okay pending egress components per approved plans- to be verified at structural final.
|
BLD-Final | 2/14/2014 | 2/18/2014 | 2/18/2014 | P | NR |
Dave Hannah
|
|
|
Shawn-Please call 30 mins prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | NR |
Forrest France
|
|
|
Missing approved plans on site, may need to provide an additional exit sign.
|
BLD-Framing/Rough-in | 1/15/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Jim Sly
|
|
|
Shawn-Please call at least 30 mins prior to insepction Phone #: ###-#### Pony Wall........where glass will be installed above it OK.
|
BLD-Wall Bracing | 1/15/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Jim Sly
|
|
|
Shawn-Please call at least 30 mins prior to insepction Phone #: ###-#### Pony Wall.......Where glass is going to be installed above.....OK
|