Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD13-02973
StatusFinaled
Name J & L DEVELOPMENT LTD CORP
Site Address 1115 N GARDEN ST
Project NameRiver Valley Church
Customer Number 
ePlanReviewYes
Description
(RIVER VALLEY CHURCH) (5-5-18 PLAN MODIFICATION TO DELETE A SIDE EXIT DOOR TO THE OUTSIDE FROM THE SANCTUARY AND TO DELETE AN EXIT DOOR TO THE OUTSIDE FROM THE MULTI-PURPOSE ROOM. THE SIDE ROWS OF CHAIRS IN THE SANCTUARY WERE EVALUATED AS SINGLE ACCESS AISLES ONLY. A 48 INCH AISLE IS REQUIRED BETWEEN THE FRONT SEATS AND THE PLATFORM TO ENSURE A ROUTE ACCESSIBLE TO THE DISABLED AND TO ENSURE A BALANCED EGRESS SYSTEM FROM THE PLATFORM. THE MINIMUM AISLE AND AISLE ACCESSWAY WIDTHS WERE REDLINED ON THE DRAWINGS. SEE SHEET A2.2.) Fire sprinklers used for building area increase, story increase, and for fire area. To remodel an existing 16,442 square foot church building (14,750 square foot 1st story and 1,692 square foot 2nd story). Work is to include 5 restrooms accessible to the disabled, a 2nd story toilet room accessible to the disabled, interior nonbearing walls, interior doors, a platform within the Sanctuary, stairways and a ramp to serve the new platform, other interior ramps and stairs, exterior doors, exterior windows, a direct vent gas fireplace, and interior finishes. The existing Sanctuary mezzanine will be incorporated into the existing 2nd story. Structural work includes new openings in existing masonry walls, steel headers and jambs at those new wall openings, box headers at new openings in the exterior walls of the pre-engineered metal building portion of this structure, a new exterior steel canopy and trellis with concrete footings, and new overbuilt floors and pony walls on the 2nd story to make the entire floor surface of the 2nd story at the same elevation. Special Inspection is required for welding, epoxy anchors, and expansion anchors. The pre-engineered trusses located within the Sanctuary and intended to support theatrical lighting, projection screens, etc. and the attachment of the trusses to existing steel beams are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. If the building will be occupied during construction, precautions approved by the Fire Department to ensure safe egress shall be implemented. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20185/23/20185/23/2018APASS
DetailsJim Sly
Please call ahead for access - Jessie Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection5/21/20185/22/20185/22/2018APASS
DetailsTroy Cobbley
Life safety passed

jesse Phone #: ###-####
FIRE-Final Inspection5/17/20185/21/20185/21/2018ACANC
DetailsTroy Cobbley
Scheduled for the wrong day.

Jesse Phone #: ###-####
FIRE-Final Inspection5/16/20185/17/20185/17/2018ACANC
DetailsTroy Cobbley
Jesse Phone #: ###-####
FIRE-Final Inspection2/21/20182/23/20182/23/2018AFAIL
DetailsTroy Cobbley
Provide revised city approved plans for deletion of the exit doors, provide evac plans as per note 23, repair the two north corridor exit signs, provide a K class extinguisher in the Kitchen, provide final inspection for the fire alarm permit, provide elecrical covers in the Nursery.

Jessy Phone #: ###-####
FIRE-Final Inspection2/20/20182/21/20182/20/2018ACANC
DetailsTroy Cobbley
To be rescheduled for Friday. Jesse Phone #: ###-####
BLD-Final8/21/20178/22/20178/22/2017PNR
DetailsJim Sly
Jessie Phone #: ###-####
Need Fire Final.
FIRE-Final Inspection8/21/20178/22/20178/22/2017AFAIL
DetailsTroy Cobbley
I only had time for a quick curtesy walk through today. Need the project related fire alarm and fire sprinkler permits finaled. Need ADA compliant hardware for all new doors, plans need to be re-submitted showing the three exteriro doors deleted with their associated exit signs and discharge lights, missing exit signs in Santuary, non-functional sings in Lobby and Santuary, need code compliant hood and suppression system for the type 1 hood in the Kitchen as noted on the approved drawings, missing electric alarm sprinkler bell, missing exit signs in the existing Classroom portion of building as shown on the plans. ....ect. No fire dept review notes on site.

Jessie Phone #: ###-####
BLD-Ceiling Grid Inspection8/15/20178/16/20178/16/2017APASS
DetailsJim Sly
Ron Phone #: ###-####
BLD-Framing/Rough-in6/13/20176/14/20176/14/2017PPASS
DetailsJim Sly
Ron Phone #: ###-####
OK to Rock.
BLD-Conference5/4/20175/8/20175/8/2017ADONE
DetailsJim Sly
Met with Tim ....Staff member in charge of Constr. Phase 1.....Sanctuary and Mezzanine remodel appear complete......Phase 2 area is being framed by new contractor. WIP Advised Tim to have Crane alarm and Phoenix Fire to call in for inspection for areas that are completed to obtain a "partial" Pass inspection for those areas.
FIRE-Conference12/6/201612/6/201612/6/2016PDONE
DetailsScott Arellano
Onsite visit to check on progress and meet with owner. Construction work remains in progress. Advised owners representatives to have fire protection contractors call in for testing and inspection of completed systems for partial completion.
FIRE-Conference12/2/201612/2/201612/5/2016ADONE
DetailsTroy Cobbley
See Jim Sly's entry from speaking to the church staff
BLD-Conference12/2/201612/2/201612/2/2016ADONE
DetailsJim Sly
Talked to Jim Brennen and Pastor Chris. Talked to them about 180 day permit expiration. Slow progress.......fired GC .......volunteer help. WIP.
BLD-Framing/Rough-in5/9/20165/11/20165/11/2016APART
DetailsMike Jordan
Jim Phone #: ###-####. Interior wood framed demissing walls on 2nd.floor ok. Needs electrical rough in inspection, and fire sprinkler inspection. Also needs to foam all penetrations in bottom and top plates.
BLD-Framing/Rough-in4/6/20164/7/20164/7/2016APASS
DetailsMike Jordan
TIM// PLEASE CALL BEFORE Phone #: ###-####. 2nd floor infill.
BLD-Framing/Rough-in10/10/201410/13/201410/13/2014APART
DetailsJim Sly
Russ Phone #: ###-####
Walls, Stairs and ramps around and behind stage.
BLD-Framing/Rough-in8/13/20148/14/20148/14/2014PPART
DetailsJim Sly
partial framing // Russ Phone #: ###-####
OK to one side long wall at mezzanine.....small wall behind platform.