Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03050
StatusFinaled
Name ESI
Site Address 1001 E PARKCENTER BLVD
Project NameK-Mart
Customer Number 
ePlanReviewYes
Description
(K-MART – Interior Non-structural Demo and Minor T.I.) This permit is to perform mostly interior non-structural demolition. Scope of work includes: adding a new exterior opening into CMU wall, installing an access later and hatch, construct two interior non-combustable walls to isolate a service area, removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and removal of some existing light fixtures. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. All building sprinkler and alarm systems must be maintained throughout the demo and after demo is completed.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/23/20141/24/20141/24/2014PPASS
DetailsJim Storey
craig Phone #: ###-####
DOC - Permit Finaled1/24/20141/24/20141/24/2014PPASS
DetailsJim Storey
FIRE-Final Inspection1/22/20141/22/20141/22/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in12/19/201312/19/201312/19/2013PPART
DetailsJim Sly
tim Phone #: ###-####
All full height walls located near riser room had 5/8 fire code rock....each side.....and screwed per 1 hr rated wall standards. Walls may have to be rated and closed (with door) at a later date......or on a T I permit.
FIRE-Conference12/16/201312/16/201312/17/2013PDONE
DetailsForrest France
Regarding project related fire alarm work.
BLD-Framing/Rough-in12/12/201312/13/201312/13/2013APASS
DetailsJim Storey
craig - after 10:00 please Phone #: ###-####