Permit Information
Permit NumberBLD13-03253
StatusFinaled
Name INTERSTATE TRUCK & EQUIPMENT COMPAN
Site Address 7132 W TARGEE ST
Project NameGillingham Bldg #2
Customer Number 
ePlanReviewNo
Description
(R&R TRUCK SERVICE) (GILLINGHAM BUILDING#2) Permit to construct a new 12,096 square foot non separated use, VB building and associated site work. The office portion of the structure is 1,104 square feet and service/repair area is 10,992 square feet. This building service repair area consists of 4 separate areas. The areas are separated by combustible, bearing and nonbearing walls. The office area consists of 2 offices, reception area, 2 ADA compliant restrooms and a break room. This building is fully fire sprinklered. Concrete work is to include concrete footings, concrete foundations, and concrete slabs on grade. According to the Geotechnical Investigation, this site has undocumented fill that may extend up to 45 feet below the footings of the new building. The existing material below where the spread footings will be located is required to be removed to a depth of at least 2 feet below the bottom of the proposed spread footings and replaced with structural fill. This work and all other site work is required to comply with the approved Geotechnical Investigation report and letter prepared by the Geotechnical Engineer. Special Inspections include concrete and soils. Inspections by the Geotechnical Engineer are also required.**ajs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/3/201410/3/201410/3/2014PPASS
DetailsJim Sly
larry Phone #: ###-####
OK for Perm. Occ.
BLD-Final9/30/20149/30/20149/30/2014PNR
DetailsJim Sly
as soon as possible // Larry Phone #: ###-####
Need ACHD, Zoning, Public Works, Fire Alarm, Fire Sprinkler, ...... finals prior to Structural Final. - ok for temp
FIRE-Final Inspection9/29/20149/30/20149/30/2014APART
DetailsTroy Cobbley
A temporary occupancy is being given with Scott's permission for ten working days. Need riser room to be certified one hour, provide knox key box and provide single action hardware on all interior doors.
FIRE-Final Inspection9/26/20149/29/20149/29/2014ACANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning per Larry Phone #: ###-####
BLD-Final9/26/20149/29/20149/29/2014PNR
DetailsPhil Shearer
Larry Phone #: ###-####
BLD-Final9/26/20149/26/20149/26/2014PNR
DetailsPhil Shearer
larry Phone #: ###-####
FIRE-Final Inspection9/26/20149/26/20149/26/2014PFAIL
DetailsTroy Cobbley
Provide single action hardware for the interior doors, provide one hour rated fire riser room, provide knox box and placement by the boise city fire dept., provide final inspections for the project related fire sprinkler and fire alarm permits.
BLD-Final9/23/20149/24/20149/24/2014ANR
DetailsPhil Shearer
Larry Phone #: ###-####
BLD-Final9/19/20149/22/20149/22/2014ANR
DetailsMike Jordan
Larry-please call 30 minutes prior Phone #: ###-####. Needs fire/life/safety and fire alarm and fire sprinkler finals.
BLD-Energy code compliance6/25/20146/26/20146/26/2014PPASS
DetailsTom Arcoraci
jeff Phone #: ###-####
BLD-Framing/Rough-in6/20/20146/23/20146/23/2014PPASS
DetailsTom Arcoraci
Jeff Phone #: ###-####
BLD-Wall Bracing5/19/20145/20/20145/20/2014APASS
DetailsTom Arcoraci
Jeff Phone #: ###-####
BLD-Concrete5/12/20145/13/20145/13/2014APASS
DetailsTom Arcoraci
Jeff Phone #: ###-#### roof ok
BLD-Foundation3/19/20143/20/20143/20/2014APASS
DetailsTom Arcoraci
concrete foundation/pouring at 2:30 - jeff Phone #: ###-####
BLD-Footing3/17/20143/18/20143/18/2014APART
DetailsTom Arcoraci
request 11am, wants to pour at 11:30 // Jeff Phone #: ###-#### pending spec insp by strata