FIRE-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passsed
|
BLD-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Jim Storey
|
|
|
after 9am // call before to meet // Amy Phone #: ###-####
|
BLD-Final | 11/25/2013 | 11/27/2013 | 11/27/2013 | P | FAIL |
Jim Storey
|
|
|
Please call ahead for access 5-10 min -Amy Cell- ###-#### Phone #: ###-#### Provide address, provide exit sign in warehouse, remove deadbolt, change hardware to single action, adjust the door strengh for opening, provide exit discharge lighting, provide sticker at main exit
|
FIRE-Final Inspection | 11/25/2013 | 11/26/2013 | 11/27/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide address, provide exit sign in warehouse, remove deadbolt, change hardware to single action, adjust the door strengh for opening, provide exit discharge lighting, provide sticker at main exit
|