BLD-Final | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Jim Storey
|
|
|
call before // Gil Phone #: ###-####
|
DOC - Permit Finaled | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Forrest France
|
|
|
Phase two completed. Final fire life safety inspection passed.
|
BLD-Ceiling Grid Inspection | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Jim Storey
|
|
|
Gill-Late am please and please call at least 30 mins prior to insepction Phone #: ###-#### pending ele aproval
|
BLD-Framing/Rough-in | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PASS |
Jim Storey
|
|
|
dale - call prior Phone #: ###-####
|
BLD-Final | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | PASS |
Jim Storey
|
|
|
gail Phone #: ###-#### ok to occ office temp wall in place for phase 1.
|
FIRE-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | PART |
Forrest France
|
|
|
Phase one TI work at the north half as defined by the temp wall passed life safety walkthrough.
|
BLD-Final | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | NR |
Jim Storey
|
|
|
call 1/2 hr before // phase 1 only // Gill Phone #: ###-####
|
FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PART |
Forrest France
|
|
|
On site discussion with contractor regarding completion of phase one work and area separation between phases to maintain fire protection.
|
BLD-Ceiling Grid Inspection | 1/6/2014 | 1/7/2014 | 1/7/2014 | A | PASS |
Jim Storey
|
|
|
gale - please call 20 minutes prior Phone #: ###-####
|
FIRE-Conference | 12/18/2013 | 12/19/2013 | 12/19/2013 | A | DONE |
Forrest France
|
|
|
On site conference regarding existing fire sprinkler system coverage at the remodel area.
|
BLD-Framing/Rough-in | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Jim Storey
|
|
|
Please call 20min - Early afternoon - Gil Phone #: ###-####
|