Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-03281
StatusIssued
Name ECKMAN & MITCHELL CONSTRUCTION LLC
Site Address 8949 S FEDERAL WAY
Project NameCummins Boise CNG/LNG Shop
Customer Number 
ePlanReviewYes
Description
(CUMMINS BOISE CNG/LNG MECHANIC SHOP) Fire sprinkler system used for area increase, for repair garage, and for fire area. To convert a diesel mechanic shop to a compressed natural gas (CNG) and liquefied natural gas (LNG) shop in addition to a diesel shop. Work is to include two new openings in existing exterior tilt-up concrete panels for new exterior doors, steel columns at those new openings to resist out-of-plane lateral loads, upgrading an existing interior wall to comply as a 1-hr fire barrier wall, constructing a new 1-hr fire barrier wall, steel beams and columns to support added roof top mechanical equipment, new 24” wide by 36” high louver openings in existing exterior tilt-up concrete panels located above existing overhead doors, and a steel rack to support the new boiler. New hot water type unit heaters, new exhaust fans, and a make-up air unit will be provided. A new boiler will serve the new unit heaters. Special Inspection is required for bolting and for welding. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. A gas detection system will be provided that will provide audible and visual signals, will deactivate heating systems, and will be interlocked with the mechanical ventilation system. The fire sprinkler system is required to comply with NFPA 13 and the alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Conference6/24/20146/25/20146/25/2014PDONE
DetailsForrest France
Tom Phone #: ###-#### *Completed by C. Hanson*
BLD-Other4/28/20144/29/20144/29/2014APASS
DetailsJim Storey
Fire caulking - Tony Phone #: ###-#### fire stopping in progess/ wall ok
BLD-Energy code compliance4/23/20144/24/20144/24/2014ANR
DetailsJim Storey
Tony Phone #: ###-#### fiberglas insulation instaled not menrial wool. pending arch change or replace fiberglass.
BLD-Framing/Rough-in4/21/20144/22/20144/22/2014APART
DetailsJim Storey
Tony Phone #: ###-#### need to extend head of wall to collum supports.