BLD-Final | 1/2/2015 | 1/5/2015 | 1/6/2015 | P | PASS |
Dave Hannah
|
|
|
MJ Phone #: ###-####
|
FIRE-Final Inspection | 1/2/2015 | 1/5/2015 | 1/5/2015 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled. Inspection passed.
|
BLD-Final | 12/31/2014 | 1/2/2015 | 1/2/2015 | P | CANC |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
FIRE-Final Inspection | 12/31/2014 | 1/2/2015 | 1/2/2015 | P | CANC |
Forrest France
|
|
|
Bill ###-####
|
FIRE-Final Inspection | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | PART |
Forrest France
|
|
|
TCO approved pending trade related fire alarm final.
|
BLD-Final | 12/30/2014 | 12/31/2014 | 12/31/2014 | P | NR |
Dave Hannah
|
|
|
MJ Phone #: ###-####
|
FIRE-Conference | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | DONE |
Forrest France
|
|
|
Regarding project related fire alarm and sprinkler permit work.
|
BLD-Ceiling Grid Inspection | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PART |
Dave Hannah
|
|
|
Mark Phone #: ###-#### med gas and elec rooms ok to cover ceilings
|
BLD-Framing/Rough-in | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PEND |
Dave Hannah
|
|
|
Mark Phone #: ###-#### 1hr lid med gas and elec rooms
|
BLD-Framing/Rough-in | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 9/11/2014 | 9/11/2014 | 9/11/2014 | P | PASS |
Dave Hannah
|
|
|
MJ Phone #: ###-####
|
BLD-Energy code compliance | 9/5/2014 | 9/5/2014 | 9/8/2014 | P | PASS |
Dave Hannah
|
|
|
Mark-would like as late as possible (after 2) iff possible or can you do Monday AM Phone #: ###-#### ext walls south and west parts of occ on first floor
|
BLD-Energy code compliance | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Dave Hannah
|
|
|
MJ Phone #: ###-#### ok to rock inside of west stair tower
|
BLD-Framing/Rough-in | 9/2/2014 | 9/3/2014 | 9/4/2014 | A | PART |
Dave Hannah
|
|
|
MJ Phone #: ###-#### ok to insulate framing west stair tower
|
BLD-Other | 8/13/2014 | 8/14/2014 | 8/15/2014 | P | PART |
Dave Hannah
|
|
|
Exterior metal stud inspection please Phone #: ###-#### ok to cover ext
|
BLD-Framing/Rough-in | 7/29/2014 | 7/30/2014 | 7/31/2014 | P | PART |
Dave Hannah
|
|
|
Partial framing for metal studs - MJ Phone #: ###-#### ok to cover the ne and sw ext high wall
|
BLD-Foundation | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PEND |
Dave Hannah
|
|
|
m.j. - partial - rebar Phone #: ###-#### ok after spec inspection sign off . stair tower and elev pit ftgs .
|