BLD-Final | 1/31/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Mike Jordan
|
|
|
Please Call Brian McCoy for Access Phone #: ###-#### >> Inspection requested via web by Brian McCoy. Ok for perm occ.
|
FIRE-Final Inspection | 1/31/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. No product was being stored on site at the time of the inspection.
|
FIRE-Final Inspection | 1/27/2014 | 1/27/2014 | 1/27/2014 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for corrections and their locations which include door hardware, fire extinguisher on mezzanine level and signage at the main exit door and the gas storage rooms.
|
BLD-Ceiling Grid Inspection | 1/20/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Jim Sly
|
|
|
Call Shawn for Access ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy
|
BLD-Energy code compliance | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Mike Jordan
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Jim Storey
|
|
|
Please contact Shawn for access ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy
|