BLD-Wall Bracing | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | DONE |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 1/9/2014 | 1/10/2014 | 1/10/2014 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, looks ok,, but can not get to the plans due to heater set up for the slab area, will check back later
|
BLD-Wall Bracing | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | FAIL |
Tony Young
|
|
|
Bill Phone #: ###-####,, correction notice posted,, need plans,, need proper staples for shear,, proper nailing,, etc
|
BLD-Footing | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, 10% done
|