Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD13-03369
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCAPITAL HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL – Locker Room Remodel – Sprinkler / Lighting / Seismic Upgrade) Permit is to remodel the boys and girls locker rooms to be fully accessible, upgrade the lighting and add sprinklers to all first floor classrooms, seismically upgrade the classroom walls, and upgrade one home economics kitchen to be accessible. This building is partially fire sprinklered there is an informal upgrade agreement outline attached to this permit to show the intent to have the building fully spinklered in phases over the next 5 years. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of non-combustible full height partition walls, and installation of new non-combustible full height partition walls, new lighting / switching, new accessible doors / hardware, installation of new plumbing fixtures, installation of new seismic bracing, installation of new mechanical units, construction of structural bracing to transfer new mechanical units to lower roof deck, and finishes in compliance with chapter 8 of the 2009 IBC. This building is partial Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/21/20148/22/20148/22/2014APASS
DetailsJim Sly
Ed Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/22/20148/22/20148/22/2014PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/21/20148/21/20148/21/2014PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit addressed and the exit signs and emergency lights added as per the Review Comments.
BLD-Ceiling Grid Inspection7/31/20148/1/20148/1/2014APART
DetailsJim Sly
Ed Phone #: ###-####
B hall OK.
BLD-Ceiling Grid Inspection7/23/20147/23/20147/23/2014PPART
DetailsJim Sly
Ed Cuttlers Phone #: ###-####
Select ceilings
FIRE-Conference7/22/20147/22/20147/23/2014PDONE
DetailsTroy Cobbley
Matt Forester Phone #: ###-####

Per discussion with Tim Frost and Romeo Gervais the "end gap" of the new ceiling assemble at the windows will be allowed without a requirement to "box-in" the ends.

Per conversation with Romeo Gervais the limited existing ceiling tile, installed above the conduit and wire mold, will be allowed to remain.
BLD-Framing/Rough-in7/21/20147/21/20147/21/2014PPASS
DetailsMike Jordan
Above ceiling inspection please Phone #: ###-####. Girls east shower and boys shower, girls west ADA shower ok.
BLD-Conference7/9/20147/10/20147/10/2014ADONE
DetailsJim Sly
Ed Phone #: ###-####
Walk thru done.