Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03384
StatusFinaled
Name RRC CONTRACTORS
Site Address 521 W BROAD ST
Project NameBogus Brewing Inc.
Customer Number 
ePlanReviewNo
Description
(BOGUS BREWING INC. - D.B.A.: BOISE BREWING) **5/20/14 PLAN MODIFICATION TO INCLUDE: ADDITION OF MECHANICAL ROOF TOP EQUIPMENT PER THE ENGINEER OF RECORDS EVALUATION OF THE EXISTING ROOFS STRUCTURAL CAPACITY TO SUPPORT THE NEW EQUIPMENT IN THE SPECIFIED LOCATIONS PER THE ENGINEERED PLANS. SRZ** - **3/12/14 PLAN MODIFICATION TO INCLUDE: INSTALLATION OF AN APPROVED AUTOMATIC SPRINKLER SYSTEM AND ALTERATIONS TO THE MEZZANINE. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM WILL REQUIRE A SEPARATE PERMIT AND SHALL BE INSTALLED PER NFPA 13 AS REGULATED BY THE BOISE FIRE DEPARTMENT. SRZ** To remodel an existing 3,722 square foot building for use as a brewery. The Northwest wall is shared with the Boise Weekly and is an existing 2-hour rated fire wall. Interior demolition work completed under BLD13-02797. Work to include: infill a fire-rated door opening in the existing 2-hour Fire-rated wall; infill an existing interior concrete ramp per plans; remove and replace a portion of the existing concrete floor slab per plan location; install a new storefront window system and entry door; construct new interior walls to create a new walk-in cooler and utility room; construct a new mezzanine and stairs per plans; related interior finishes in compliance with chapter 8 of the 2009 IBC; install new roof top mechanical equipment; plumbing, electrical, mechanical work; and all other work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. The maximum occupant load total for the Assembly areas is 90 persons. This maximum occupant load shall be posted in a conspicuous place, near the main exit. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/29/20145/29/20145/29/2014PPASS
DetailsDave Hannah
Derrick Phone #: ###-####
BLD-Final5/28/20145/28/20145/29/2014PPEND
DetailsDave Hannah
late today after Dixie does her final on the chiller on the roof
BLD-Final5/19/20145/20/20145/21/2014APART
DetailsDave Hannah
Derrik-Please call at least 30 mins prior so he can meet ya there Phone #: ###-#### ok for temp cc
FIRE-Final Inspection5/20/20145/21/20145/20/2014APASS
DetailsForrest France
Fire life safety inspection completed satisfactory. Plan modification and project related FIR permits finaled. *NOTE- inspection finished on 5/20.
FIRE-Final Inspection5/16/20145/19/20145/19/2014APEND
DetailsForrest France
Pending plan modification and permit related FIR trade work.