BLD-Other | 2/14/2018 | 2/15/2018 | 2/16/2018 | P | NR |
Dave Hannah
|
|
|
Railing and Guardrail Inspection on Main Street Stairs and Patios. Prior to tearing down fence. Phone #: ###-#### Inspection requested via web by Anna Ellis
|
BLD-Final | 6/25/2015 | 6/25/2015 | 7/2/2015 | P | PEND |
Dave Hannah
|
|
|
Dennis Phone #: ###-#### needs a final letter on all spec inspections
|
FIRE-Final Inspection | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety inspection, HR, Annex passed/complete
|
BLD-Final | 3/31/2015 | 4/1/2015 | 4/2/2015 | A | PEND |
Dave Hannah
|
|
|
Bruce Phone #: ###-####ok to occ the I T area print shop
|
FIRE-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PART |
Forrest France
|
|
|
Fire life safety walkthrough completed for the print office 147A, IT 151, flex office 153, HR office 154/155, IT work area and hall 170/171. Hardware at the HR office revised while on site, hardware at the print shop to storage area/restroom vestibules to be corrected as discussed.
|
BLD-Ceiling Grid Inspection | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Forrest France
|
|
|
Preliminary walkthrough of the cafeteria area and adjacent corridor regarding fire life safety items. Cafe area EM lights and exit signs tested okay. Discussed locations of exit signs at the corridor.
|
BLD-Framing/Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Dave Hannah
|
|
|
###-####-IT room
|
BLD-Ceiling Grid Inspection | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Bob Archibald
|
|
|
Cafateria - 1st thing please - Bruce Phone #: ###-####
|
BLD-Final | 1/21/2015 | 1/23/2015 | 1/23/2015 | A | PEND |
Dave Hannah
|
|
|
bruce Phone #: ###-#### ok to move into hr area
|
FIRE-Final Inspection | 1/21/2015 | 1/23/2015 | 1/23/2015 | A | PART |
Forrest France
|
|
|
Completed fire life safety walkthrough of the HR dept. remodel area first floor- 6th street exit access and egress path to be maintained available as discussed.
|
BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### kitchen area by front door ok after elec oks
|
BLD-Conference | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | DONE |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/7/2015 | 1/9/2015 | 1/9/2015 | A | PART |
Dave Hannah
|
|
|
Dennis-print shop and HR dept-call to meet for inspection Phone #: ###-#### ok to cover hr area after other trades ok
|
BLD-Conference | 12/22/2014 | 12/23/2014 | 12/23/2014 | A | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Dave Hannah
|
|
|
Bruce-CH2 basement east side, CH@ 4th floor east side, Annex print shop Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2014 | 11/12/2014 | 11/13/2014 | P | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok to insulate nw section ext walls and cover int walls
|
BLD-Ceiling Grid Inspection | 10/8/2014 | 10/9/2014 | 10/10/2014 | A | PASS |
Dave Hannah
|
|
|
CH2 4th lobby - Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/24/2014 | P | PASS |
Dave Hannah
|
|
|
CH2 - 3rd fl - Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Dave Hannah
|
|
|
2nd fl lobby - Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Dave Hannah
|
|
|
ch 2, 2nd floor lobby Phone #: ###-####
|
FIRE-Conference | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PART |
Forrest France
|
|
|
Inspection for verification of adjusted fire sprinkler coverage at the first floor office 103 completed.
|
BLD-Conference | 7/29/2014 | 7/30/2014 | 7/31/2014 | A | PART |
Dave Hannah
|
|
|
Conference for Phased finals at basement and 1st floor CH2 at west side Phone #: ###-#### phase one these areas are ok
|
FIRE-Final Inspection | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | PART |
Forrest France
|
|
|
Phase one work at the basement level west side CH2 elevator lobby sheet A100 okayed. Phase one 1st floor west side CH2 sheet A110 hall, lobby, and office okay with the exception of overspaced fire sprinkler coverage at office 103 due to relocated walls.
|
BLD-Final | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | NR |
Jim Storey
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PART |
Forrest France
|
|
|
Regarding completion of work at the basement level.
|
BLD-Framing/Rough-in | 7/1/2014 | 7/2/2014 | 7/2/2014 | P | DONE |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### Framing approved for cover @ art annex area on main floor.
|
BLD-Footing | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Dave Hannah
|
|
|
Bruce (10AM) Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/18/2014 | 6/19/2014 | 6/19/2014 | P | FAIL |
Dave Hannah
|
|
|
bruce - basement lobby CH2 Phone #: ###-####
|