Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-03477
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 408 E PARKCENTER BLVD Unit: 210
Project NameIvie and Associates TI
Customer Number 
ePlanReviewYes
Description
(Ivie and Associates TI) (Suite 210)Plan Modification 2/27/14 to add a 100 sq foot office in the open office area. Permit to construct office partition walls for the existing vanilla finish space. Vanilla finish was under BLD11-00308. Scope of work to include nonbearing noncombustible walls to create 5 offices, 2 conference rooms, 1 copy room, 1 break room and open office space. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/3/20144/4/20144/4/2014PPASS
DetailsJim Storey
Ben Phone #: ###-####
FIRE-Final Inspection4/3/20144/4/20144/4/2014APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Framing/Rough-in3/10/20143/11/20143/11/2014PPASS
DetailsJim Storey
Ben Phone #: ###-#### ok pending ele aproval.
BLD-Final2/25/20142/25/20142/25/2014PPASS
DetailsDave Hannah
Ben Phone #: ###-####
FIRE-Final Inspection2/21/20142/21/20142/21/2014PPASS
DetailsForrest France
Fire life safety passed.
BLD-Final2/21/20142/21/20142/21/2014PPART
DetailsJim Storey
ben Phone #: ###-#### temp ok// final occ ok pending ele final.
BLD-Ceiling Grid Inspection2/5/20142/5/20142/5/2014PPASS
DetailsJim Storey
Ben-PLease call prior to insepctrion Phone #: ###-####
BLD-Framing/Rough-in1/17/20141/21/20141/21/2014APASS
DetailsJim Storey
ben Phone #: ###-####