Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD14-00106
StatusFinaled
Name AEI
Site Address 9700 W BETHEL CT
Project NameDataSite BOISE T.I.
Customer Number 
ePlanReviewYes
Description
(DATASITE BOISE) (HP building #25) Permit for tenant improvements to 33,840 sq. ft. of an existing 59,854 sq. ft. building with work to include raising the existing access floor system 12" to a height of 24", installation of two new accessible ramps, misc access granted locks at the server and security areas, minor reconfiguration of the office areas HVAC and electrical work per the approved plans. This building is fully fire sprinklered for area increase; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20144/4/20144/4/2014PPASS
DetailsMike Jordan
Please have Mike call Antonio at ###-####. Hand rail corrections from yesterday''s inspection are taking place this morning and we would like to schedule inspection for later in the afternoon to ensure completion prior to re-inspection. Phone #: ###-#### >> Inspection requested via web by Antonio Carone. All issues resolved. ok for perm occ.
FIRE-Final Inspection4/3/20144/3/20144/3/2014PPASS
DetailsTroy Cobbley
Life safety passed. Verified emergency generator function for the exit signs/emergency lights power source.
BLD-Final4/3/20144/3/20144/3/2014AFAIL
DetailsMike Jordan
Spoke with Mike yesterday about canceling and re-scheduling for today between 8:00am and 9:00am. He alleviated that this was acceptable. Feel free to notify me if anything changes. Phone #: ###-#### >> Inspection requested via web by Antonio Carone. Provide code comlpiant handrails and provide edge protection at ramps on data floor.
BLD-Final4/2/20144/2/20144/2/2014PCANC
DetailsMike Jordan
Would like to schedule for late afternoon. Please have inspector contact me direct this morning for scheduling of time if possible. Antonio Carone ###-#### Phone #: ###-#### >> Inspection requested via web by Antonio Carone. Contractor called and cancelled inspection.
BLD-Ceiling Grid Inspection3/26/20143/26/20143/26/2014APASS
DetailsTom Arcoraci
Require a re-inspect this morning as soon as possible. Mike attempted preliminary inspection Tuesday March 25 unable to complete, no printed permit plans on site. Phone #: ###-#### >> Inspection requested via web by Antonio Carone
BLD-Ceiling Grid Inspection3/25/20143/25/20143/25/2014PFAIL
DetailsMike Jordan
Doug Phone #: ###-####. Needs to provide city set of approved plans.
BLD-Ceiling Grid Inspection3/24/20143/25/20143/25/2014PCANC
DetailsMike Jordan
Doug Phone #: ###-####. Added in error.
BLD-Framing/Rough-in2/24/20142/25/20142/25/2014APASS
DetailsJim Sly
Dan MClenna Phone #: ###-####