BLD-Final | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | CANC |
Mike Jordan
|
|
|
Nick Phone #: ###-####
|
BLD-Final | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Mike Jordan
|
|
|
Nick Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Framing/Rough-in | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Energy code compliance | 11/18/2014 | 11/18/2014 | 11/18/2014 | P | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-####. exterior walls only ok to cover.
|
BLD-Framing/Rough-in | 11/17/2014 | 11/17/2014 | 11/17/2014 | P | PART |
Mike Jordan
|
|
|
Interior steel stud framed walls. ok to insulate. Waiting for resubmittal for the two additional noffices that have been added.
|
BLD-Framing/Rough-in | 11/14/2014 | 11/17/2014 | 11/17/2014 | A | NR |
Mike Jordan
|
|
|
Dan Phone #: ###-####. No approved plans on site. No inspection.
|
BLD-Framing/Rough-in | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | NR |
Mike Jordan
|
|
|
Dan Phone #: ###-####. Needs mep rough in inspections first.
|