BLD-Final | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####. The additional electrical work has been done and signed off. ok for perm occ.
|
BLD-Final | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Mike Jordan
|
|
|
ok for 30 day temp occ. Verified that an electrical permit was pulled to complete the work in patient care area to make it comply. Did not sign card.
|
BLD-Final | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PART |
Mike Jordan
|
|
|
Met with Daryl, (electrical inspector) on site to review groundeing requirements for the infusion room. It was determined that this area needs to have the seperate grounding as per NEC requirements. Noted to contractor that once a new electrical permit has been issued for this work, a 30 day temp. occ. would be granted while this work is completed and other portions of building could be used.
|
BLD-Final | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Moved to pm. Meeting electrical inspector on site to verify correct grounding and wiring methods in infusion room.
|
FIRE-Final Inspection | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | FAIL |
Troy Cobbley
|
|
|
needs hardware and exit signs
|
BLD-Framing/Rough-in | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####. Interior steel stud framed walls ok.
|