BLD-Final | 3/5/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Phil Shearer
|
|
|
Charles Phone #: ###-####
|
BLD-Final | 2/11/2015 | 2/12/2015 | 2/12/2015 | A | PART |
Mike Jordan
|
|
|
Charlie Phone #: ###-####. Ok for temp. occ.
|
BLD-Final | 2/9/2015 | 2/11/2015 | 2/11/2015 | P | NR |
Mike Jordan
|
|
|
Change of day per Charlie 2-10-15 blh Phone #: ###-####. Needs public works and zoning finals.
|
FIRE-Final Inspection | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/9/2015 | 2/11/2015 | 2/10/2015 | A | FAIL |
Troy Cobbley
|
|
|
Charlie Phone #: ###-####
|
BLD-Framing/Rough-in | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Jim Storey
|
|
|
Charley Phone #: ###-####
|
BLD-Energy code compliance | 12/24/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Jim Storey
|
|
|
Charley Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2014 | 12/15/2014 | 12/15/2014 | P | PASS |
Mike Jordan
|
|
|
Charlie Phone #: ###-####. All previous issues have been resolved. it is ok to cover the exterior of the building.
|
BLD-Wall Bracing | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | PASS |
Mike Jordan
|
|
|
Charlie Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | FAIL |
Mike Jordan
|
|
|
Charlie Phone #: ###-####. Re nail sill plate, provide additional nailing above opening on shear wall type 2. Install nuts on anchor bolts at exterior columns.
|
BLD-Framing/Rough-in | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PASS |
Mike Jordan
|
|
|
roof//Charley Phone #: ###-####. Roof diaphragm ok to cover, all repairs per engineers RFI for straps that were installed incorrectly. Also miising straps installed per approved plans.
|
FIRE-Conference | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | DONE |
Troy Cobbley
|
|
|
Discussed fire stopping in the exterior columns.
|
BLD-Framing/Rough-in | 11/25/2014 | 12/1/2014 | 12/1/2014 | A | FAIL |
Mike Jordan
|
|
|
Charlie Phone #: ###-####. Roof diaphragm inspection. Edge and field nailing and associated blocking ok. Missing 2 CMSTC40 straps on east and west ends. Also will need engineering on remainder of roof strapping not installed per approved plan. End of straps should have been bent over 2x6 ledger and nailed. In place work, strapping stops at edge of 2x8 and nailed.
|
BLD-Footing | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PART |
Mike Jordan
|
|
|
Work in progress. Special inspector to reinforcemment in footings.
|
BLD-Foundation | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | NR |
Mike Jordan
|
|
|
Late AM - Charlie Phone #: ###-####. work in progress. Will have special inspection
|